PO12.3 grid code certification campaign 2017

Ten years ago, Spanish government established that all PV plants installed in Spanish territory shall fulfil the Low Voltage Ride Through protection requirements according PO12.3 (Operation Procedure number 12.3) since first of January 2012, though a Certificate performed by an accredited certification body.

This certificate shall be renovated every 5 years.

srv9

TCERE’s Team performed during the last 2017, the Certification of 2.2 GW of PV and wind power plants with more than 120 PV power plants and 40 Wind farms according Spanish requirements PO12.3.