Fronius Galvo 2.5-1/ CDP-0 / MC3-63 / GE CTX 634052 | 07/04/2022 | 07/04/2027 | 20406-1-CER | FRONIUS + CIRCUTOR | RD244/2019+UNE21001:2020; UNE 217001 IN: 2015 | SISTEMA VERTIDO CERO | ||
Fronius Primo 8.2-1 / CDP-0 / MC3-63 / GE CTX 634052 | 07/04/2022 | 07/04/2027 | 20406-2-CER | FRONIUS + CIRCUTOR | RD244/2019+UNE21001:2020; UNE 217001 IN: 2015 | SISTEMA VERTIDO CERO | ||
Fronius Symo 15.0-3/ CDP-0 / MC3-63 / GE CTX 634052 | 07/04/2022 | 07/04/2027 | 20406-3-CER | FRONIUS + CIRCUTOR | RD244/2019+UNE21001:2020; UNE 217001 IN: 2015 | SISTEMA VERTIDO CERO | ||
ECO 25.0-3-S / CDP-0 + CVM-MINI-MC + MC3-125 / MC-18a/4 | 07/04/2022 | 07/04/2027 | 20406-4-CER | FRONIUS + CIRCUTOR | RD244/2019+UNE21001:2020; UNE 217001 IN: 2015 | SISTEMA VERTIDO CERO | ||
INGECON SUN 1110TL B400 | 08/11/2019 | 08/11/2022 | 10978-29-CER-E9 | Ingeteam Power Technology S.A. - Energy | IEC 61000-6-2:2005; IEC 61000-6-4: 2006; IEC 61000-6-1: 2005 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 03/11/2019 | 03/11/2022 | 20487-4-CER | Ingeteam Power Technology S.A. - Energy | PEA:2016 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 03/11/2019 | 03/11/2022 | 20487-5-CER | Ingeteam Power Technology S.A. - Energy | MEA:2013 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 03/11/2019 | 03/11/2022 | 20455-6-CER | Ingeteam Power Technology S.A. - Energy | Arrete 23: 2008 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 03/11/2019 | 03/11/2022 | 11251-14-CER-E6 | Ingeteam Power Technology S.A. - Energy | ABNT NBR 16149:2013; ABNT NBR 16150:2013; NDU-015:2012 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 03/11/2019 | 03/11/2022 | 20455-7-CER | Ingeteam Power Technology S.A. - Energy | COES SINAC:2013 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 03/11/2019 | 03/11/2022 | 20455-8-CER | Ingeteam Power Technology S.A. - Energy | Electric Rule 21:2015 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 03/11/2019 | 03/11/2022 | 11251-21-CER-E6 | Ingeteam Power Technology S.A. - Energy | DEWA:2016 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 03/11/2019 | 03/11/2022 | 20455-1-CER | Ingeteam Power Technology S.A. - Energy | Egypt Wind farm grid code: 2014 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1110TL B400 | 03/11/2019 | 03/11/2022 | 11251-25-CER-E7 | Ingeteam Power Technology S.A. - Energy | IEC 60529:1989+AMD2:2013+COR1:2019 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 21/11/2019 | 21/11/2022 | 20455-10-CER | Ingeteam Power Technology S.A. - Energy | IEC 62103: 2003; EN 50178:1997 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 03/11/2019 | 03/11/2022 | 20455-11-CER | Ingeteam Power Technology S.A. - Energy | IEC 61439-1:2011; IEC 61439-2:2011 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 08/11/2019 | 08/11/2022 | 11251-29-CER-E7 | Ingeteam Power Technology S.A. - Energy | IEC 61000-6-2:2005; IEC 61000-6-4: 2006; IEC 61000-6-1: 2005 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 13/02/2020 | 13/02/2023 | 20487-3-CER | Ingeteam Power Technology S.A. - Energy | IEC 61000-3-4:1998; IEC 61000-3-12:2011 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 13/02/2020 | 13/02/2023 | 20487-2-CER | Ingeteam Power Technology S.A. - Energy | IEC 61000-3-11:2017 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 03/11/2019 | 03/11/2022 | 20455-4-CER | Ingeteam Power Technology S.A. - Energy | G59/3:2013 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 13/02/2020 | 13/02/2023 | 20487-1-CER | Ingeteam Power Technology S.A. - Energy | IEC 62116:2014 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 03/11/2019 | 03/11/2022 | 20455-5-CER | Ingeteam Power Technology S.A. - Energy | UNE 206007-1:2013 IN | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 19/11/2019 | 19/11/2022 | 20266-8-CER | Ingeteam Power Technology S.A. - Energy | IEC 61683:1999 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 03/11/2019 | 03/11/2022 | 11251-9-CER-E6 | Ingeteam Power Technology S.A. - Energy | IEC 61727:2004 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 03/11/2019 | 03/11/2022 | 11251-24-CER-E7 | Ingeteam Power Technology S.A. - Energy | IEC 62109-1:2010; IEC 62109-2:2011 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1110TL B400 | 25/11/2019 | 25/11/2022 | 20455-3-CER | Ingeteam Power Technology S.A. - Energy | IEC 61683: 1999 | INVERSOR FOTOVOLTAICO | ||
TRIO – 27.6+CDP 0+CIRCUTOR CVM+CIRCUTOR MC3+LS | 26/03/2020 | 22/01/2023 | 20320-1-CER-E1 | ABB+CIRCUTOR+CIRCUTOR+CIRCUTOR+metasol | RD244/2019 | SISTEMA VERTIDO CERO | ||
PVS– 100TL+CDP 0+CIRCUTOR CVM+CIRCUTOR MC3+LEGRAND CTX3 | 26/03/2020 | 26/03/2023 | 20320-2-CER | ABB+CIRCUTOR+CIRCUTOR+CIRCUTOR+metasol | RD244/2019 | SISTEMA VERTIDO CERO | ||
SG50CX+UMG96RM-EL+meteocontrol blueLog+Janitza KUW2/40+Schneider contactor | 25/02/2020 | 25/02/2023 | 20322-1-CER | Sungrow+meteocontrol+Janitza+Schneider | RD244/2019 | SISTEMA VERTIDO CERO | ||
SG110CX+UMG96RM-EL+meteocontrol blueLog+Janitza KUW2/40+Schneider contactor | 30/03/2020 | 30/03/2023 | 20322-2-CER | Sungrow+meteocontrol+Janitza+Schneider | RD244/2019 | SISTEMA VERTIDO CERO | ||
INGECON SUN 1170TL B450 | 26/05/2020 | 26/05/2023 | 20605-1-CER | Ingeteam Power Technology S.A. - Energy | NTCO: 2019; NTSCS: 2019 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 26/05/2020 | 26/05/2023 | 20605-2-CER | Ingeteam Power Technology S.A. - Energy | Egyptian Solar energy plants:2017 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 26/05/2020 | 26/05/2023 | 20605-3-CER | Ingeteam Power Technology S.A. - Energy | PGC Philippines Grid Code:2016 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 26/05/2020 | 26/05/2023 | 20605-4-CER | Ingeteam Power Technology S.A. - Energy | Panama: 2017 | INVERSOR FOTOVOLTAICO | ||
BGRID 135 | 05/06/2020 | 05/06/2023 | 20572-1-CER | Energy Storage Solutions S.L. | IEC 61727: 2004 | INVERSOR FOTOVOLTAICO | ||
BGRID 135 | 05/06/2020 | 05/06/2023 | 20572-2-CER | Energy Storage Solutions S.L. | IEC 62116: 2014 | INVERSOR FOTOVOLTAICO | ||
BGRID 135 | 05/06/2020 | 05/06/2023 | 20572-3-CER | Energy Storage Solutions S.L. | IEC 61683: 1999 | INVERSOR FOTOVOLTAICO | ||
BGRID 235 | 05/06/2020 | 05/06/2023 | 20572-4-CER | Energy Storage Solutions S.L. | IEC 62109-1:2010; IEC 62109-2:2011 | INVERSOR FOTOVOLTAICO | ||
BGRID 235 | 10/07/2020 | 10/10/2023 | 20621-CER | Energy Storage Solutions S.L. | CISPR-11: 2015; IEC 61000-6-2: 2005 | INVERSOR FOTOVOLTAICO | ||
APS1300-ES-2-330-1 | 16/07/2020 | 16/07/2023 | 20550-2-CER | WSTECH GmbH | AS 4777.2:2015 | Inverter for PV, Energystorage, Statcom, Hybrid | ||
APS1300-ES-2-330-1 | 16/07/2020 | 16/07/2023 | 20550-4-CER | WSTECH GmbH | IEC 61000-6-2: 2016; 'IEC 61000-6-4: 2018 | Inverter for PV, Energystorage, Statcom, Hybrid | ||
GAMESA E-2,25 MVA-SB-I | 07/09/2022 | 21/07/2025 | 21604-2-CER | Gamesa Electric S.A.U. | IEC 62116: 2014 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 21/07/2020 | 21/07/2023 | 20335-5-CER | Ingeteam Power Technology S.A. - Energy | G99 | STORAGE INVERTER | ||
INGECON SUN 1170TL B450 | 21/07/2020 | 21/07/2023 | 20335-2-CER | Ingeteam Power Technology S.A. - Energy | EN 50549-2:2019 | STORAGE INVERTER | ||
GAMESA E-2,25 MVA-SB-I | 07/09/2022 | 18/08/2025 | 21604-1-CER | Gamesa Electric S.A.U. | IEC 61683: 1999 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 25/08/2020 | 25/08/2023 | 20552-1-CER | Ingeteam Power Technology S.A. - Energy | Malaysian Grid Code: 2015 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 25/08/2020 | 25/08/2023 | 20552-3-CER | Ingeteam Power Technology S.A. - Energy | IEC 61727:2004 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 25/08/2020 | 25/08/2023 | 20552-4-CER | Ingeteam Power Technology S.A. - Energy | VDE 0126-1-1: 2013 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 25/08/2020 | 25/08/2023 | 20552-5-CER | Ingeteam Power Technology S.A. - Energy | DEWA: 2016 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 25/08/2020 | 25/08/2023 | 20552-6-CER | Ingeteam Power Technology S.A. - Energy | IEC 61000-3-12: 2011; IEC 61000-3-4: 1998 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 25/08/2020 | 25/08/2023 | 20552-7-CER | Ingeteam Power Technology S.A. - Energy | IEC 61000-3-11: 2017 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1250TL B450 | 25/08/2020 | 25/08/2023 | 20552-2-CER | Ingeteam Power Technology S.A. - Energy | IEC 61683: 1999 | INVERSOR FOTOVOLTAICO | ||
Blueplanet 165 TL3 M1 WM OD IIQ0 | 30/09/2020 | 30/09/2023 | 20537-2-CER | KACO new energy GmbH | IEC 61727: 2004 | INVERSOR FOTOVOLTAICO | ||
Blueplanet 165 TL3 M1 WM OD IIQ0 | 30/09/2020 | 30/09/2023 | 20537-3-CER | KACO new energy GmbH | IEC 62116: 2014 | INVERSOR FOTOVOLTAICO | ||
Blueplanet 165 TL3 M1 WM OD IIQ0 | 30/09/2020 | 30/09/2023 | 20537-4-CER | KACO new energy GmbH | EN 50438: 2013; 'Bulgaria Czech Republic, Netherlands, Hungary, Poland, Portugal, Turkey | INVERSOR FOTOVOLTAICO | ||
Blueplanet 165 TL3 M1 WM OD IIQ0 | 30/09/2020 | 30/09/2023 | 20537-5-CER | KACO new energy GmbH | UTEC-15-712-1: 2013 | INVERSOR FOTOVOLTAICO | ||
Blueplanet 165 TL3 M1 WM OD IIQ0 | 30/09/2020 | 30/09/2023 | 20537-7-CER | KACO new energy GmbH | AS 4777.2:2015 | INVERSOR FOTOVOLTAICO | ||
Blueplanet 165 TL3 M1 WM OD IIQ0 | 30/09/2020 | 30/09/2023 | 20537-9-CER | KACO new energy GmbH | UNE 206007-1: 2013 IN | INVERSOR FOTOVOLTAICO | ||
Blueplanet 165 TL3 M1 WM OD IIQ0 | 30/09/2020 | 30/09/2023 | 20537-11-CER | KACO new energy GmbH | IEC 62109-1: 2010; 'IEC 62109-2: 2011; 'IEC 60529: 1989 / AMD2: 2013 / COR1: 2019 | INVERSOR FOTOVOLTAICO | ||
Blueplanet 165 TL3 M1 WM OD IIQ0 | 30/09/2020 | 30/09/2023 | 20537-12-CER | KACO new energy GmbH | VDE-V-0126-1-1: 2013. Greece | INVERSOR FOTOVOLTAICO | ||
Blueplanet 165 TL3 M1 WM OD IIQ0 | 30/09/2020 | 30/09/2023 | 20537-13-CER | KACO new energy GmbH | South Africa version 3,0. August 2019 | INVERSOR FOTOVOLTAICO | ||
Blueplanet 165 TL3 M1 WM OD IIQ0 | 30/09/2020 | 30/09/2023 | 20537-16-CER | KACO new energy GmbH | ENA-EREC.G99. 2019 | INVERSOR FOTOVOLTAICO | ||
Blueplanet 165 TL3 M1 WM OD IIQ0 | 30/09/2020 | 30/09/2023 | 20537-17-CER | KACO new energy GmbH | EN 50549-1:2019; 'EN 50549-2:2019 | INVERSOR FOTOVOLTAICO | ||
Blueplanet 165 TL3 M1 WM OD IIQ0 | 08/10/2020 | 08/10/2020 | 20537-10-CER | KACO new energy GmbH | VDE-V-0126-1-1: 2006-02. VFR19 | INVERSOR FOTOVOLTAICO | ||
Blueplanet 165 TL3 M1 WM OD IIQ0 | 28/10/2020 | 28/10/2020 | 20726-CER | KACO new energy GmbH | IRR-DCC-MV: 2015 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 55TL 220 | 04/11/2020 | 04/11/2023 | 20552-8-CER | Ingeteam Power Technology S.A. - Energy | IEC 62116: 2014 (50 Hz/60 Hz) | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 04/11/2020 | 04/11/2023 | 20552-9-CER | Ingeteam Power Technology S.A. - Energy | IEC 62116: 2014 (50 Hz/60 Hz) | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 04/11/2020 | 04/11/2023 | 20552-10-CER | Ingeteam Power Technology S.A. - Energy | IEC 62109-1: 2010; IEC 62109-2: 2011 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 04/11/2020 | 04/11/2023 | 20552-11-CER | Ingeteam Power Technology S.A. - Energy | EN 50530: 2010 + A1: 2013 | INVERSOR FOTOVOLTAICO | ||
SUN2000-185KTL-H1 | 11/11/2020 | 18/11/2022 | 20745-CER | Huawei Technologies Co., Ltd. | NTSCS: 2020 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 11/11/2020 | 11/11/2023 | 20487-6-CER | Ingeteam Power Technology S.A. - Energy | South Africa version 3,0. August 2019 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 18/11/2020 | 18/11/2023 | 20552-12-CER | Ingeteam Power Technology S.A. - Energy | MEA:2013 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 18/11/2020 | 18/11/2023 | 20552-13-CER | Ingeteam Power Technology S.A. - Energy | Egyptian Wind farm:2014 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 18/11/2020 | 18/11/2023 | 20552-14-CER | Ingeteam Power Technology S.A. - Energy | IRR-DCC:2015 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 18/11/2020 | 18/11/2023 | 20552-15-CER | Ingeteam Power Technology S.A. - Energy | IRR-TIC:2015 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 19/11/2020 | 19/11/2023 | 20552-16-CER | Ingeteam Power Technology S.A. - Energy | UNE 206007-1: 2013 IN | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 19/11/2020 | 19/11/2023 | 20552-17-CER | Ingeteam Power Technology S.A. - Energy | NDU-015:2012 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 19/11/2020 | 19/11/2023 | 20552-18-CER | Ingeteam Power Technology S.A. - Energy | ABNT NBR 16149: 2013; ABNT NBR 16150: 2013 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 55TL 220 | 19/11/2020 | 19/11/2023 | 20552-19-CER | Ingeteam Power Technology S.A. - Energy | ABNT NBR 16149: 2013; ABNT NBR 16150: 2013 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 55TL 220 | 19/11/2020 | 19/11/2023 | 20552-20-CER | Ingeteam Power Technology S.A. - Energy | IEC 62109-1:2010; IEC 62109-2:2011 | INVERSOR FOTOVOLTAICO | ||
IFX6 2670 | 01/12/2020 | 01/12/2023 | 20576-CER | JEMA Energy S.A. | UNE 206007-1: 2013 IN | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 04/12/2020 | 04/12/2023 | 20552-21-CER | Ingeteam Power Technology S.A. - Energy | IEC 60529:1989 (IPx5 / IP6x) | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 04/12/2020 | 04/12/2023 | 20552-22-CER | Ingeteam Power Technology S.A. - Energy | Egyptian Solar energy plants:2015 | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 160TL (3Play series) | 04/12/2020 | 04/12/2023 | 20552-23-CER | Ingeteam Power Technology S.A. - Energy | NTCO:2019; NTCSyC:2020 | INVERSOR FOTOVOLTAICO | ||
PQstorl-M | 12/01/2021 | 20/01/2024 | 20807-4-CER | ABB Power Grids Belgium n.v. - Power Quality Products | EN 50549-1:2019; EN 50549-2:2019 | Storage Inverter | ||
APS1300-ES-2-330-1 | 16/07/2020 | 16/07/2023 | 20550-3-CER | WSTECH GmbH | IEC 62116: 2014 | Inverter for PV, Energystorage, Statcom, Hybrid | ||
APS1300-ES-2-330-1 | 16/07/2020 | 16/07/2023 | 20550-5-CER | WSTECH GmbH | IEC 62109-1: 2010; 'IEC 62109-2: 2011; 'IEC 60529: 1989 / AMD2: 2013 / COR1: 2019 | Inverter for PV, Energystorage, Statcom, Hybrid | ||
APS1300-ES-2-330-1 | 06/11/2020 | 06/11/2023 | 20679-CER | WSTECH GmbH | C10/11: 2019 | Inverter for PV, Energystorage, Statcom, Hybrid | ||
PS 500 | 23/03/2021 | 25/01/2024 | 20382-1-CER-E1 | ABB Power Grids Italy S.p:A. | EN 50549-2:2019 | Bidirectional Energy Storage & Microgrid PCS | ||
APS1300-ES-2-330-1 | 17/12/2020 | 17/12/2023 | 20838-CER | WSTECH GmbH | Arrete du juin 2020 | Inverter for PV, Energystorage, Statcom, Hybrid | ||
SIEMENS SINACON | 25/02/2021 | 24/07/2023 | 20885-1-CER | SIEMENS AG | IEC 62116:2014 | INVERSOR FOTOVOLTAICO | ||
SIEMENS SINACON | 25/02/2021 | 06/08/2023 | 20885-2-CER | SIEMENS AG | IEC 61683: 1999 | INVERSOR FOTOVOLTAICO | ||
PS 500 | 23/03/2021 | 26/02/2024 | 20382-3-CER-E1 | ABB Power Grids Italy S.p:A. | Portaria 73/ 2020 | Bidirectional Energy Storage & Microgrid PCS | ||
SIEMENS SINACON | 02/03/2021 | 06/08/2023 | 20885-3-CER | SIEMENS AG | IEC 61000-6-2: 2016; 'IEC 61000-6-4: 2018 | INVERSOR FOTOVOLTAICO | ||
PS 500 | 23/03/2021 | 05/03/2024 | 20769-1-CER-E1 | ABB Power Grids Italy S.p:A. | G99: 2019 | Bidirectional Energy Storage & Microgrid PCS | ||
50-100195 (PD500) | 23/03/2021 | 05/03/2024 | 20708-7-CER-E1 | EPC Power Corp. | Portaria 73/ 2020 | Bidirectional Energy Storage & Microgrid PCS | ||
50-100195 (PD500) | 05/03/2021 | 05/03/2024 | 20708-10-CER | EPC Power Corp. | IEC 62116: 2014 | Bidirectional Energy Storage & Microgrid PCS | ||
IFX6-2550 IFX6-1700 | 12/03/2021 | 12/03/2024 | 20731-CER | JEMA ENERGY S.A. | EN 50530: 2010 + A1: 2013 | Three phase solar inverter | ||
Gamesa electric Stor DC/DC 650 kW | 15/03/2020 | 15/03/2024 | 20414-1-CER | Gamesa Electric | IEC 61683: 1999 | DC-DC Battery Converter | ||
Gamesa electric Stor DC/DC 650 kW | 15/03/2020 | 15/03/2024 | 20414-2-CER | Gamesa Electric | IEC 62109-1: 2010 | DC-DC Battery Converter | ||
APS2600-ES-4-330-1 | 13/04/2021 | 16/07/2023 | 20965-CER | WSTECH GmbH | ABNT NBR 16149: 2013; 'ABNT NBR 16150: 2013; 'NDU-015:2012 | Inverter for PV, Energystorage, Statcom, Hybrid (60Hz) | ||
PV 3750STD | 29/04/2021 | 29/04/2024 | 20764-1-CER | Gamesa Electric | CEA 2007 + AMD 2013 + AMD 2019 | INVERSOR FOTOVOLTAICO | ||
APS1300-ES-2-330-1 | 20/05/2021 | 20/05/2024 | 20909-1-CER | WSTECH GmbH | IEC 62116: 2014 (60 Hz) | Inverter for PV, Energystorage, Statcom, Hybrid | ||
APS1300-ES-2-330-1 | 20/05/2021 | 20/05/2024 | 20909-2-CER | WSTECH GmbH | IEC 61000-6-2: 2016; IEC 61000-6-4: 2016 | Inverter for PV, Energystorage, Statcom, Hybrid | ||
Tauro Eco 100-3-P | 21/05/2021 | 21/05/2024 | 20788-1-CER | Fronius | UNE 206007-1:2013 IN | Three phase solar inverter | ||
Tauro Eco 100-3-P | 21/05/2021 | 21/05/2024 | 20788-2-CER | Fronius | UNE 217002: 2020 | Three phase solar inverter | ||
Blueplanet 50.0 TL3 + CcMaster + UMG 96RM + Janitza 6A315.3 + CTX3 130 4P | 21/05/2021 | 21/05/2024 | 20879-CER | Enerclic Innovatio S.L. & Romur Renovables | Real Decreto 244/2019 | Sistema vertido cero | ||
APS2180-PV-2-600-5 | 26/05/2021 | 26/05/2024 | 20909-3-CER | WSTECH GmbH | IEC 61683: 1999 | Inverter for PV, Energystorage, Statcom, Hybrid | ||
50-100195 (PD500) | 31/05/2021 | 31/05/2024 | 20708-12-CER | EPC Power Corp. | IEC 61727: 2004 | Bidirectional Energy Storage & Microgrid PCS | ||
50-100195 (PD500) | 30/06/2021 | 05/03/2024 | 20960-3-CER | EPC Power Corp. | G99: 2020 | Bidirectional Energy Storage & Microgrid PCS | ||
50-100195 (PD500) | 30/06/2021 | 05/03/2024 | 20960-4-CER | EPC Power Corp. | EN50549-2: 2019 | Bidirectional Energy Storage & Microgrid PCS | ||
GAMESA E-2,25 MVA-SB-I | 01/07/2021 | 22/07/2023 | 20922-CER | Gamesa Electric S.A.U. | IEC 62109-1:2010; IEC 62109-2:2011 | INVERSOR FOTOVOLTAICO | ||
PS1000 480/3L.1 | 20/07/2021 | 16/07/2024 | 21080-1-CER-E1 | ABB Power Grids Italy S.p:A. | EN 50549-2: 2019; Slovenian & Denmark & Sweden & Hungary deviations | Bidirectional Energy Storage & Microgrid PCS | ||
EFASOLAR 500 | 23/07/2021 | 23/07/2024 | 20606-3-CER | Efacec Energía, Máquinas e Equipamentos Eléctricos, SA | Portaria 73/2020 | |||
APS600-ES-4-330-1 | 06/08/2021 | 06/08/2024 | 20909-5-CER | WSTECH GmbH | IEC 62109-1: 2010; 'IEC 62109-2: 2011; 'IEC 60529 : 1989 / AMD2: 2013 / COR1: 2019 | Inverter for PV, Energystorage, Statcom, Hybrid (60Hz) | ||
PV 3750STD | 13/08/2021 | 11/06/2025 | 20933-2-CER | Gamesa Electric | IEC 62116:2014 | INVERSOR FOTOVOLTAICO | ||
PV 3750STD | 01/09/2021 | 19/06/2025 | 20933-6-CER | Gamesa Electric | IEC 61727:2004 | Three-phase Solar PV/Storage Inverter | ||
PV 3750STD | 01/09/2021 | 23/06/2025 | 20933-5-CER | Gamesa Electric | IEC 60529:1989 / AMD2:2013 / COR1:2019 (IP55 (IP5x category II) | Three-phase Solar PV/Storage Inverter | ||
PV 3750STD | 01/09/2021 | 23/06/2025 | 20933-4-CER | Gamesa Electric | IEC 60529:1989 / AMD2:2013 / COR1:2019 (IP55 (IP5x category I) | Three-phase Solar PV/Storage Inverter | ||
PV 3750STD | 01/09/2021 | 11/06/2025 | 20933-3-CER | Gamesa Electric | IEC 61683:1999 | Three-phase Solar PV/Storage Inverter | ||
PV 3750STD | 08/09/2021 | 23/11/2025 | 20933-5-CER | Gamesa Electric | IEC 60529:1989/AMD2:2013/COR1:2019; IP 55 | Three-phase Solar PV/Storage Inverter | ||
PV 3750STD | 08/09/2021 | 23/11/2025 | 20933-4-CER | Gamesa Electric | IEC 60529:1989/AMD2:2013/COR1:2019; IP 55 | Three-phase Solar PV/Storage Inverter | ||
50-100195 (PD500) | 08/10/2021 | 08/10/2026 | 21169-CER | EPC Power Corp. | EN 50549-2:2019 | Bidirectional Energy Storage & Microgrid PCS | ||
ZGR SOLAR STR 2 | 14/10/2021 | 14/10/2026 | 20945-2-CER | Zigor Corporación S.A. | IEC 61000-3-2:2018+AMD1:2020 | INVERSOR FOTOVOLTAICO | ||
PVS-33TL-SX | 15/10/2021 | 15/10/2026 | 21100-1-CER | FIMER S.p.A | Portaria 73/2020 | Three-phase Solar Inverter | ||
TS228KTL-HV | 24/11/2022 | 12/11/2026 | 21819-CER | TBEA Xi'an Electric Technology Co. Ltd. | Portaria 73/2020 | Three-phase Solar Inverter | ||
PVS-15-TL-SX | 23/11/2021 | 23/11/2026 | 21100-2-CER | FIMER S.p.A | Portaria 73/2020 | Three-phase Solar Inverter | ||
INGECON SUN 100TL | 25/11/2021 | 25/11/2026 | 20552-25-CER | Ingeteam Power Technology S.A. - Energy | NRS 097-2-1:2017 | Three-phase Solar Inverter | ||
PV 3750STD | 25/11/2021 | 25/11/2026 | 20764-5-CER | Gamesa Electric | Portaria 73/2020 | Three-phase Solar Inverter | ||
PV 3750STD | 25/11/2021 | 25/11/2026 | 20764-6-CER | Gamesa Electric | EN 50549-1:2019; EN 50549-2:2019 | Three-phase Solar Inverter | ||
PV 3750STD | 03/12/2021 | 03/12/2026 | 20764-9-CER | Gamesa Electric | Arrete du juin 2020 | Three-phase Solar Inverter | ||
INGECON SUN 1170TL B450 | 09/12/2021 | 09/12/2026 | 20487-7-CER | Ingeteam Power Technology S.A. - Energy | CRE-3025:2016 | INVERSOR FOTOVOLTAICO | ||
PV 3750STD | 15/12/2021 | 15/12/2021 | 20764-12-CER | Gamesa Electric | UTE C15-712-1:2013 | Three-phase Solar Inverter | ||
Freesun HEMK FS3300K | 23/12/2021 | 27/11/2022 | 20886-1-CER-E1 | Power Electronics S.L. | IEC 62109-1:2010; IEC 62109-2:2011 | Photovoltaica/storage converter | ||
Freesun HEMK FS3300K | 23/12/2021 | 25/05/2024 | 20886-2-CER-E1 | Power Electronics S.L. | IEC 62116:2014 | Photovoltaica/storage converter | ||
O-Track Hz 2P | 18/01/2022 | 18/01/2027 | 20686-CER | Optimum Tracker | IEC 62817:2014+AMD1:2017 | Horizontal single axis tracker | ||
TCU STR300 | 08/0/2022 | 27/01/2027 | 20667-8-CER-E1 | P4Q Electronics S.L. | IEC 62109-1:2010 | Solar tracker control unit | ||
CL50 / Insight Facility / WND-WR-MB / ACTL-0750-200 / CTX3 130 4P | 02/02/2022 | 02/02/2022 | 20857-1-CER | Schneider Electric Solar | RD 244/2019 | Sistema vertido cero | ||
50-100180-R2 (CAB1000/AC-3L.1-R2) | 04/02/2022 | 04/02/2027 | 21170-CER | EPC Power Corp. | EN 50549-2:2019 | Bidirectional Energy Storage & Microgrid PCS | ||
50-100180-R2 (CAB1000/AC-3L.1-R2) | 04/02/2022 | 15/06/2026 | 20708-14-CER-E2 | EPC Power Corp. | EN 50549-2:2019 | Bidirectional Energy Storage & Microgrid PCS | ||
50-100180-R2 (CAB1000/AC-3L.1-R2) | 04/02/2022 | 04/02/2027 | 20708-16-CER | EPC Power Corp. | Arrete du juin 2020 | Bidirectional Energy Storage & Microgrid PCS | ||
50-100180-R2 (CAB1000/AC-3L.1-R2) | 04/02/2022 | 04/02/2027 | 20708-17-CER | EPC Power Corp. | Portaria 73/2020 | Bidirectional Energy Storage & Microgrid PCS | ||
PS500 | 04/02/2022 | 25/01/2026 | 20382-2-CER-E2 | Hitachi Energy Italy S.p.A. | Arrete du juin 2020 | Bidirectional Energy Storage & Microgrid PCS | ||
APS1300-ES-2-330-1 | 24/02/2022 | 24/02/2027 | 21401-CER | WSTECH GmbH | ORDER 30/2013 | Inverter for PV, Energystorage, Hybrid | ||
50-100195 (PD500) | 15/03/2022 | 05/03/2026 | 20960-1-CER-E1 | EPC Power Corp. | Arrete du 9 juin 2020 | Bidirectional Energy Storage & Microgrid PCS | ||
INGECON SUN 100TL | 24/03/2022 | 24/03/2027 | 20475-5-CER | Ingeteam Power Technology S.A. | C10/11: 2021 | Three-phase Solar Inverter | ||
21860/1 SCB 12 entradas-2 POLOS SALIDA DOBLE | 04/04/2022 | 04/04/2027 | 21277-CER | SOLUCIONES TÉCNICAS MTECH S.L. | IEC 61439-2:2020 | String Box | ||
CGBT&SCADA | 06/04/2022 | 21/03/2027 | 21079-CER-E1 | INSTALACIONES NEGRATIN S.L. | IEC 61439-1:2020/IEC 61439-2:2020 | Electric board | ||
Blueplanet 165 TL3 M1 WM OD IIQ0 | 13/04/2022 | 13/04/2027 | 21252-CER | KACO new energy GmbH | Tor Erzeuger, Type A and B + R25 | INVERSOR FOTOVOLTAICO | ||
SUNRIDER®-SR – Single AXIS | 13/04/2022 | 13/04/2027 | 20338-2-CER | Mecanizados Solares S.L. | IEC 62817:2014+AMD1:2017 | SEGUIDOR FOTOVOLTAICO | ||
PS1000 / 3L.1 | 21/04/2022 | 21/04/2027 | 21396-2-CER | Hitachi Energy Italy S.p.A. | Portaria 73/2020 | Bidirectional Energy Storage & Microgrid PCS | ||
PS1000 / 3L.1 | 21/04/2022 | 21/04/2027 | 21396-3-CER | Hitachi Energy Italy S.p.A. | Arrete du juin 2020 | Bidirectional Energy Storage & Microgrid PCS | ||
PV 3750STD | 21/11/2021 | 29/04/2024 | 20764-14-CER | Gamesa Electric | CEA:2007 + AMD:2013 + AMD:2019 | Three-phase Solar Inverter&Three-phase Bidirectional Converter | ||
TCU STB 150 | 29/04/2022 | 24/09/2027 | 21022-2-CER | P4Q Electronics S.L. | IEC 61000-6-2:2016; IEC 61000-6-4:2018 | Solar tracker control unit | ||
TCU STB 150 | 29/04/2022 | 24/09/2027 | 21022-3-CER | P4Q Electronics S.L. | IEC 62109-1:2010 | Solar tracker control unit | ||
PV 3750STD | 29/04/2022 | 11/06/2025 | 21191-1-CER | Gamesa Electric S.A.U. | IEC 62116:2014 | Three-phase Solar Inverter | ||
PV 3750STD | 29/04/2022 | 11/06/2025 | 21191-2-CER | Gamesa Electric S.A.U. | IEC 61683:1999 | Three-phase Solar Inverter | ||
PV 3750STD | 29/04/2022 | 19/06/2025 | 21191-3-CER | Gamesa Electric S.A.U. | IEC 61727:2004 | Three-phase Solar Inverter | ||
PV 3750STD | 29/04/2022 | 11/06/2025 | 21191-4-CER | Gamesa Electric S.A.U. | IEC 62109-1:2010; 'IEC 62109-2:2011 | Three-phase Solar Inverter | ||
PV 3750STD | 29/04/2022 | 23/06/2025 | 21191-5-CER | Gamesa Electric S.A.U. | IEC 60529:1989 / AMD2:2013 / COR1:2019 (IP55 (IP5x category I) | Three-phase Solar PV/Storage Inverter | ||
PV 3750STD | 29/04/2022 | 23/06/2025 | 21191-6-CER | Gamesa Electric S.A.U. | IEC 60529:1989 / AMD2:2013 / COR1:2019 (IP55 (IP5x category II) | Three-phase Solar PV/Storage Inverter | ||
blueplanet gs 137 TL3-S B1 WM OD IIPX | 06/05/2022 | 06/05/2027 | 21014-3-CER | KACO new energy GmbH | C10/11 V2.2 | Grid-tied battery inverter | ||
blueplanet gs 137 TL3-S B1 WM OD IIPX | 06/05/2022 | 06/05/2027 | 21014-5-CER | KACO new energy GmbH | VDE V 0126-1-1:2006 | Grid-tied battery inverter | ||
blueplanet gs 137 TL3-S B1 WM OD IIPX | 06/05/2022 | 06/05/2027 | 21014-6-CER | KACO new energy GmbH | UTEC-15-712-1: 2013 | Grid-tied battery inverter | ||
blueplanet gs 137 TL3-S B1 WM OD IIPX | 06/05/2022 | 06/05/2027 | 21014-11-CER | KACO new energy GmbH | IEC 61683 : 1999 | Grid-tied battery inverter | ||
blueplanet gs 137 TL3-S B1 WM OD IIPX | 06/05/2022 | 06/05/2027 | 21014-14-CER | KACO new energy GmbH | UNE 206007-1IN:2013; UNE 217002:2020 | Grid-tied battery inverter | ||
blueplanet 10.0 TL3 / XC-10000 / UMG 96RM-EL / KUW2/40 / LC1D115004P7 | 06/05/2021 | 17/11/2026 | 20801-1-CER-E1 | KACO + meteocontrol | RD 244/2019 | Sistema vertido cero | ||
blueplanet 10.0 TL3 / XC-10000 / UMG 96RM-EL / KUW2/40 / LC1D115004P7 | 06/05/2021 | 17/11/2026 | 20801-2-CER-E1 | KACO + meteocontrol | UNE 217001: 2020 | Sistema vertido cero | ||
ZGR SOLAR STR 4 | 06/10/2021 | 14/10/2026 | 20945-3-CER | Zigor Corporación S.A. | IEC 61000-3-12:2011 + AMD1: 2021 | INVERSOR FOTOVOLTAICO | ||
ZGR SOLAR STR 50 | 06/10/2021 | 14/10/2026 | 20945-1-CER | Zigor Corporación S.A. | IEC 61000-3-12:2011 + AMD1: 2021 | INVERSOR FOTOVOLTAICO | ||
ZGR SOLAR STR 5 | 15/11/2021 | 15/11/2026 | 20889-4-CER | Zigor Corporación S.A. | UNE 217002:2020 | INVERSOR FOTOVOLTAICO | ||
ZGR SOLAR STR 50 | 15/11/2021 | 15/11/2026 | 20889-3-CER | Zigor Corporación S.A. | UNE 217002:2020 | INVERSOR FOTOVOLTAICO | ||
SUNRIDER®-SR – Single Axis 1V | 02/02/2022 | 02/02/2027 | 20747-CER | Mecanizados Solares S.L. | IEC 62817: 2014 + A1:2017 | Horizontal single axis tracker | ||
L-TEC tracker 2P AC | 09/05/2022 | 09/05/2027 | 20836-1-CER | Ideematec Deutschland GmbH | IEC 62817:2014 + A1:2017 | Horizontal single axis tracker | ||
blueplanet gs 137 TL3-S B1 WM OD IIPX | 11/05/2022 | 11/05/2027 | 21014-15-CER | KACO new energy GmbH | TOR Erzeuger: Type A and B | Grid-tied battery inverter | ||
blueplanet gs 137 TL3-S B1 WM OD IIPX | 11/05/2022 | 11/05/2027 | 21014-16-CER | KACO new energy GmbH | AMBIENTE E AÇÃO CLIMÁTICA Portaria nº73/2020. Type A and B | Grid-tied battery inverter | ||
blueplanet gs 137 TL3-S B1 WM OD IIPX | 20/05/2022 | 20/05/2027 | 21014-18-CER | KACO new energy GmbH | ORDER 30/2013 | Grid-tied battery inverter | ||
STI H-250 v06.1 | 09/06/2022 | 27/05/2027 | 20977-2-CER-E1 | Soluciones Técnicas Integrales Norland S.L. (Pamplona) | IEC 62817: 2014 + A1:2017 | Horizontal single axis dual row tracker | ||
3750 STD | 01/06/2022 | 01/06/2027 | 20764-11-CER | Gamesa Electric | G99: 2021 | Three-phase Solar Inverter | ||
Elemento de control: Schneider Electric M340 Analizador de red: Schneider Electric PM5320 Transformador de tensión: Polylux PTM520 Transformador de corriente: SACI TU3 Contactor: Schneider Electric LC1D | 24/06/2022 | 24/06/2027 | 21013-CER | EPSAR | RD244/2019 | self consumption system | ||
blueplanet gs 137 TL3-S B1 WM OD IIPX | 04/07/2022 | 04/07/2027 | 21014-9-CER | KACO new energy GmbH | EN 50549-1: 2019 | Grid-tied battery inverter | ||
blueplanet gs 137 TL3-S B1 WM OD IIPX | 04/07/2022 | 04/07/2027 | 21014-10-CER | KACO new energy GmbH | EN 50549-1: 2019 | Grid-tied battery inverter | ||
APS2600-ES-4-330-1 | 29/06/2022 | 16/07/2026 | 21602-CER | WSTECH GmbH | IEC 62109-1: 2010; 'IEC 62109-2: 2011; 'IEC 60529 : 1989 / AMD2: 2013 / COR1: 2019 | Inverter for PV, Energystorage, Statcom, Hybrid (50Hz) | ||
blueplanet gs 137 TL3-S B1 WM OD IIPX | 06/07/2022 | 06/07/2027 | 21014-8-CER | KACO new energy GmbH | EN 50549-1: 2019 | Grid-tied battery inverter | ||
INGECON SUN 100TL | 14/07/2022 | 19/11/2026 | 20475-6-CER-E1 | Ingeteam Power Technology S.A. | Arrete du juin 2020 | Three-phase Solar Inverter | ||
INGECON SUN 100TL | 14/07/2022 | 19/11/2026 | 20475-8-CER-E1 | Ingeteam Power Technology S.A. | EN 50549-1: 2019; EN 50549-2:2019 | Three-phase Solar Inverter | ||
INGECON SUN 100TL | 14/07/2022 | 25/11/2026 | 20552-25-CER-E1 | Ingeteam Power Technology S.A. | NRS 097-2-1:2017 | Three-phase Solar Inverter | ||
PV Combiner box PVS-16MH | 30/08/2022 | 30/08/2027 | 21296-CER | Sungrow Power Supply Co., Ltd | IEC 61439-1:2020 | Low-voltage switchgear and controlgear assemblies | ||
PV Combiner box PVS-18MH | IEC 61439-2:2020 | |||||||
PS1000/3L.1 | 27/07/2022 | 27/07/2027 | 21649-CER | Hitachi Energy Italy S.P.A. | EN 50549-2:2019. | Bidirectional Energy Storage & Microgrid PCS | ||
L-TEC tracker 1P DC | 07/09/2022 | 07/09/2027 | 20836-2-CER | Ideematec Deutschland GmbH | IEC 62817:2014 + A1:2017 | Horizontal single axis tracker | ||
blueplanet 125 TL3 M1 WM OD IIP0 | 15/09/2022 | 15/09/2027 | 21402-CER | KACO new energy GmbH | VDE V 0126-1-1:2006 | Three-phase Solar inverter | ||
APS1300-ES-2-330-1 | 21/09/2022 | 24/01/2025 | 21501-CER | WSTECH GmbH | ENA-EREC G99 | Inverter for PV, Energystorage, Statcom, Hybrid | ||
BRATRACKER DUAL-ROW | 30/09/2022 | 30/09/2027 | 21255-CER | BRAMETAL S.A. | IEC 62817:2014 + A1:2017 | Horizontal single axis tracker | ||
Sungrow SG110CX + Wedbyn WebdynSunPM + Janitza UGM 604-E + Janitza KUW2/40 + Schneider Electric LC1D115004 | 30/09/2022 | 30/09/2027 | 21530-1-CER | Webdyn SAS | Real Decreto 244/2019_Anexo I; UNE 217001:2020 | self consumption system | ||
Ingecon Sun 1170TL B450 | 05/10/2022 | 05/10/2027 | 21202-CER | Ingeteam Power Technology S.A.-Energy | Portaria 73/2020 | Three-Phase Solar-Inverter | ||
NXA 0325_6 | 07/10/2022 | 07/10/2022 | 21405-CER | Vacon Ltd | IEC 62109-2:201 | Grid converter | ||
blueplanet 165 TL3 M1 WM OD IIQ0 | 18/11/2022 | 02/10/2025 | 21601-1-CER | KACO new energy GmbH | DEWA: 2016 | INVERSOR FOTOVOLTAICO | ||
Blueplanet 165 TL3 M1 WM OD IIQ0 | 18/11/2022 | 30/09/2025 | 21601-2-CER | KACO new energy GmbH | C10/11: 2019 | INVERSOR FOTOVOLTAICO | ||
NXA_0460_5 | 25/11/2022 | 08/10/2026 | 21789-2-CER | Vacon Oy | TOR Erzeuger | Grid converter | ||
NXA_0460_5 | 25/11/2022 | 02/02/2027 | 21789-1-CER | Vacon Oy | IEC 62116: 2014 | Grid converter | ||
SUN2000 – 8KLT – M1 | 01/12/2022 | 01/12/2027 | 21215-CER | Huawei Technologies Co. Ltd. | UNE 217002 octubre 2020 | INVERSOR FOTOVOLTAICO | ||
KACO blueplanet 110 TL3 M1 WM OD IIK0 | 02/12/2022 | 02/12/2027 | 21601-3-CER | KACO new energy GmbH | CEI 0-16: 2021 | Photovoltaic inverter | ||
SUN 2000 100KTL-M1 + DTSU666-H + SmartLogger3000A + CTF24-5K-250 | 15/12/2022 | 15/12/2027 | 21661-CER | Huawei + Huawei + Huawei + Huawei | RD 244/2019 | SISTEMA VERTIDO CERO | ||
UNE 217001 | ||||||||
MCS4780-PV-4-440-5 | 22/12/2022 | 22/12/2027 | 21436-CER | WSTECH GmbH | IEC 62116:2014 | Inverter for PV and Energy Storage | ||
MCS3750-ES-2-690-5 | 27/12/2022 | 27/12/2027 | 21388-1-CER | WSTECH GmbH | IEC 61000-6-2:2016; CISPR11+AMD1+AMD2:2015/16/19; IEC 62920:2017, AMD1:2021 | Inverter for PV and Energy storage | ||
NXA_0502_6 | 13/01/2022 | 28/12/2027 | 21789-4-CER-E1 | Vacon Oy | Arrêté du 9 juin 2020 | Photovoltaic inverter | ||
MCS3260-PV-2-600-5 | 28/12/2022 | 28/12/2027 | 21388-2-CER | WSTECH GmbH | IEC 61683:1999 | Inverter for PV and Energy storage | ||
SUN-HES-L-400 (Cabinet) + 1 x SUN-HES-MOD50 (Power module) + Modicon TM251MESE + Diris Digiware I-35 + 3 x TF-80 | 13/01/2023 | 13/01/2023 | 21543-CER | SOCOMEC | UNE 217001:2020 | SISTEMA VERTIDO CERO | ||
NXA_0460_5 + LCL-0460-5 | 19/07/2022 | 08/10/2026 | 21789-1-CER | Vacon Oy | EN50549-1:2019; EN50549-2:2019 | Grid converter | ||
ZCS 3PH 100KTL-LV + CcMaster Combox + UMG 96RM + TA36P + CTX3 130 4P | 20/01/2023 | 20/01/2028 | 2300013-CER | ZUCCHETTI CENTRO SISTEMI, S.P.A. | RD 244/2019 | Self consumption solution | ||
ZCS 3PH 100KTL-LV + CcMaster Combox + UMG 96RM + TA36P + CTX3 130 4P | 20/01/2023 | 20/01/2028 | 21546-1-CER | Enerclic Innovatio, S.L. | RD 244/2019 | Self consumption solution | ||
PV 3900 STD | 06/02/2023 | 11/06/2025 | 21263-CER | Gamesa Electric | IEC 62109-1:2010 | Photovoltaic inverter | ||
PV4500 PROTEUS | IEC 62109-2:2011 | Bidirectional inverter | ||||||
PQstorl-M | 30/01/2023 | 30/01/2028 | 21614-3-CER | Hitachi Energy Ltd. | G99: 2022 | Storage Inverter | ||
APS1300-ES-2-330-1 | 20/10/2022 | 16/07/2026 | 21942-CER | WSTECH GmbH | IEC 62109-1:2010; IEC 62109-2:2010; IEC 60529:1989/AMD2:2013/COR1:2019 | Inverter for PV, Energy storage, Statcom, Hybrid | ||
NXPCS1670K-HUD | 08/02/2023 | 08/02/2028 | 21328-3-CER | NEXTracker Inc | UNE 217002:2020 | Photovoltaic inverter | ||
NXPCS1670K-HUD | 08/02/2023 | 08/02/2028 | 21328-4-CER | NEXTracker Inc | IEC 62116:2014 | Photovoltaic inverter | ||
PQstorl-M | 10/02/2023 | 10/02/2028 | 21615-1-CER | Hitachi Energy Ltd. | G99: 2022 | Storage Inverter | ||
FREESUN HEMK FS4390K | 10/02/2023 | 10/02/2028 | 21015-1-CER | POWER ELECTRONICS S.L. | IEC 62116:2014 | Photovoltaic inverters | ||
FREESUN HEMK FS2195K | Bidirectional Inverters | |||||||
GSM1250 | 03/06/2020 | -- | 20191-1-CER | KSTAR | NTS:10/19 (SEPE) | INVERSOR FOTOVOLTAICO | ||
GSM1250 | 03/06/2020 | -- | 20191-1-CER-VM | KSTAR | NTS:10/19 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
SUN2000-100KTL-M1 | 29/07/2020 | -- | 20466-CER-E1 | HUAWEI | NTS:10/19 (SEPE) | INVERSOR FOTOVOLTAICO | ||
SUN2000-100KTL-M1 | 29/07/2020 | -- | 20466-CER-VM-E1 | HUAWEI | NTS:10/19 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
ZGR SOLAR CTR 1250-1000 | 04/12/2020 | -- | 20785-CER | Zigor Corporación S.A. | NTS:10/19 (SEPE) | INVERSOR FOTOVOLTAICO | ||
ZGR SOLAR CTR 1250-1000 | 04/12/2020 | -- | 20785-CER-VM | Zigor Corporación S.A. | NTS:10/19 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
SUN2000-185KTL-H1 | 16/04/2021 | -- | 20809-CER-VM-E1 | Huawei | NTS: 11/2020 (SENP) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
SUN2000-185KTL-H1 | 16/04/2021 | -- | 20809-CER-E1 | Huawei | NTS: 11/2020 (SENP) | INVERSOR FOTOVOLTAICO | ||
FS3670K | 12/05/2021 | 20823-1-CER-VM-E1 | Power Electronics | NTS: 11/2020 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | |||
FS3670K | 12/05/2021 | 20823-1-CER-E1 | Power Electronics | NTS: 11/2020 (SEPE) | INVERSOR FOTOVOLTAICO | |||
Open-PPC-01 | 08/06/2021 | -- | 20816-CER | Isemaren Energy Solutions | NTS: 04/2021 (SENP) | POWER PLANT CONTROLLER | ||
Open-PPC-01 | 08/06/2021 | -- | 20816-CER-VM | Isemaren Energy Solutions | NTS: 04/2021 (SENP) | SIMULACIÓN POWER PLANT CONTROLLER | ||
APS1300-ES-2-330-1 | 30/07/2021 | -- | 20478-CER-E1 | WSTech GmbH | NTS: 04/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
APS1300-ES-2-330-1 | 30/07/2021 | -- | 20478-CER-VM-E1 | WSTech GmbH | NTS: 04/2021 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
SIEMENS SINACON | 30/07/2021 | -- | 20883-CER-VM | SIEMENS AG | NTS: 04/2021 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
SIEMENS SINACON | 30/07/2021 | -- | 20883-CER | SIEMENS AG | NTS: 04/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 100TL | 07/07/2022 | -- | 20475-1-CER-E2 | Ingeteam Power Technology S.A. Energy | NTS: 04/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 100TL | 07/07/2022 | -- | 20475-1-CER-VM-E2 | Ingeteam Power Technology S.A. Energy | NTS: 04/2021 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
INGECON SUN 100TL | 07/07/2022 | -- | 20475-2-CER-E2 | Ingeteam Power Technology S.A. Energy | NTS: 04/2021 (SENP) | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 100TL | 07/07/2022 | -- | 20475-2-CER-VM-E2 | Ingeteam Power Technology S.A. Energy | NTS: 04/2021 (SENP) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
SUN2000-100KTL-M1 | 07/07/2022 | -- | 20985-1-CER-E2 | Huawei | NTS: 04/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
SUN2000-100KTL-M1 | 07/07/2022 | -- | 20985-1-CER-VM-E2 | Huawei | NTS: 04/2021 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
SUN2000-100KTL-M1 | 07/07/2022 | -- | 20985-2-CER-E2 | Huawei | NTS: 04/2021 (SENP) | INVERSOR FOTOVOLTAICO | ||
SUN2000-100KTL-M1 | 07/07/2022 | -- | 20985-2-CER-VM-E2 | Huawei | NTS: 04/2021 (SENP) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
PV2500 | 07/07/2022 | -- | 20763-2-CER-E2 | Gamesa Electric | NTS: 04/2021 (SENP) | INVERSOR FOTOVOLTAICO | ||
PV2500 | 07/07/2022 | -- | 20763-2-CER-VM-E2 | Gamesa Electric | NTS: 04/2021 (SENP) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
PPC | 26/11/2021 | -- | 20730-1-CER-VM | Ingelectus S.L. | NTS: 10/2021 (SEPE) | POWER PLANT CONTROLLER | ||
INGECON SUN 1170TL B450 | 13/12/2021 | -- | 20335-8-CER-E1 | Ingeteam Power Technology S.A. Energy | NTS:04/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
INGECON SUN 1170TL B450 | 13/12/2021 | -- | 20335-8-CER-VM-E1 | Ingeteam Power Technology S.A. Energy | NTS:04/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
SUN2000-4KTL-L1 | 30/12/2021 | -- | 21258-CER | Huawei | NTS:10/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
PowerManager Control Solution (PMCS) | 07/07/2022 | -- | 20766-1-CER-E2 | AlsoEnergy GmbH | NTS:04/2021 (SEPE) | POWER PLANT CONTROLLER | ||
PowerManager Control Solution (PMCS) | 07/07/2022 | -- | 20766-1-CER-VM-E2 | AlsoEnergy GmbH | NTS:04/2021 (SEPE) | SIMULACIÓN POWER PLANT CONTROLLER | ||
ISOTROL_VREWPPC2021V01 | 18/01/2022 | -- | 20794-CER-E2 | Isotrol | NTS:04/2021 (SEPE) | POWER PLANT CONTROLLER | ||
ISOTROL_VREWPPC2021V01 | 18/01/2022 | -- | 20794-CER-VM-E2 | Isotrol | NTS:04/2021 (SEPE) | SIMULACIÓN POWER PLANT CONTROLLER | ||
SG125HX | 18/02/2022 | -- | 20970-2-CER | SUNGROW POWER SUPPLY CO., LTD. | NTS:04/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
SG125HX | 18/02/2022 | -- | 20970-2-CER-VM | SUNGROW POWER SUPPLY CO., LTD. | NTS:04/2021 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
SG125HX | 18/02/2022 | -- | 20970-3-CER | SUNGROW POWER SUPPLY CO., LTD. | NTS:04/2021 (SENP) | INVERSOR FOTOVOLTAICO | ||
SG125HX | 18/02/2022 | -- | 20970-3-CER-VM | SUNGROW POWER SUPPLY CO., LTD. | NTS:04/2021 (SENP) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
Symo GEN24 6.0 Plus | 18/02/2022 | -- | 21217-1-CER | Fronius International GmbH | NTS:10/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
Symo GEN24 3.0 Plus | 18/02/2022 | -- | 21284-1-CER | Fronius | NTS:10/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
Primo GEN24 3.0 Plus | 18/02/2022 | -- | 21284-2-CER | Fronius International GmbH | NTS:10/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
FSPPC | 25/11/2021 | - | 21229-CER | Power Electronics | NTS: 04/2021 (SEPE) | POWER PLANT CONTROLLER | ||
FSPPC | 25/11/2021 | - | 21229-CER-VM | Power Electronics | NTS: 04/2021 (SEPE) | SIMULACIÓN POWER PLANT CONTROLLER | ||
Fronius Primo 6.0-1 | 11/03/2022 | - | 21284-3-CER | Fronius International GmbH | NTS:10/2021 (SEPE) | Three phase solar inverter | ||
Fronius SYMO 8.2-3-M | 11/03/2022 | - | 21284-4-CER | Fronius International GmbH | NTS:10/2021 (SEPE) | Three phase solar inverter | ||
Tauro Eco 100-3-P | 25/03/2022 | -- | 21060-1-CER | Fronius International GmbH | NTS: 10/2021 (SEPE) | Three phase solar inverter | ||
Tauro Eco 100-3-P | 25/03/2022 | -- | 21060-1-CER-VM | Fronius International GmbH | NTS: 10/2021 (SEPE) | PV Inverter simulation model | ||
Tauro Eco 100-3-P | 25/03/2022 | -- | 21060-2-CER | Fronius International GmbH | NTS: 10/2021 (SENP) | Three phase solar inverter | ||
Tauro Eco 100-3-P | 25/03/2022 | -- | 21060-2-CER-VM | Fronius International GmbH | NTS: 10/2021 (SENP) | PV Inverter simulation model | ||
Ingecon Sun 1170TL B450 | 29/03/2022 | -- | 20810-CER | Ingeteam Power Technology S.A. (Paneles) | NTS: 04/2021 (SENP) | Three phase solar inverter | ||
Ingecon Sun 1170TL B450 | 29/03/2022 | -- | 20810-CER-VM | Ingeteam Power Technology S.A. (Paneles) | NTS: 10/2021 (SENP) | PV Inverter simulation model | ||
PPC | 31/03/2022 | -- | 20730-1-CER-E1 | Ingelectus S.L. | NTS: 10/2021 (SEPE) | POWER PLANT CONTROLLER | ||
PPC | 31/03/2022 | -- | 20730-2-CER-VM-E1 | Ingelectus S.L. | NTS: 10/2021 (SEPE) | POWER PLANT CONTROLLER | ||
EP-2500-HC-UD | 29/04/2022 | -- | 20422-1-CER | SINENG ELECTRIC CO. LTD | NTS: 10/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
EP-2500-HC-UD | 29/04/2022 | -- | 20422-1-CER-VM | SINENG ELECTRIC CO. LTD | NTS: 10/2021 (SEPE) | PV Inverter simulation model | ||
EP-2500-HC-UD | 29/04/2022 | -- | 20422-2-CER | SINENG ELECTRIC CO. LTD | NTS: 10/2021 (SENP) | INVERSOR FOTOVOLTAICO | ||
EP-2500-HC-UD | 29/04/2022 | -- | 20422-2-CER-VM | SINENG ELECTRIC CO. LTD | NTS: 10/2021 (SENP) | PV Inverter simulation model | ||
blueplanet gs 137 TL3-S B1 WM OD IIP | 29/04/2022 | -- | 21014-13-CER | KACO new energy GmbH | NTS: 10/2021 (SEPE) | Grid tied battery Inverter | ||
OCR1100 | 06/05/2022 | -- | 21256-CER | Emerson | NTS: 04/2021 (SEPE) | Power Plant controller | ||
OCR1100 | 06/05/2022 | -- | 21256-CER-VM | Emerson | NTS: 04/2021 (SEPE) | SIMULACIÓN POWER PLANT CONTROLLER | ||
CX5130 | 25/05/2022 | -- | 21266-1-CER-VM | INGETEAM POWER TECHNOLOGY, S.A. | NTS: 10/2021 (SEPE) | POWER PLANT CONTROLLER SIMULATION MODEL | ||
CX5130 | 25/05/2022 | -- | 21266-1-CER | INGETEAM POWER TECHNOLOGY, S.A. | NTS: 10/2021 (SEPE) | POWER PLANT CONTROLLER | ||
CX5130 | 25/05/2022 | -- | 21266-2-CER-VM | INGETEAM POWER TECHNOLOGY, S.A. | NTS: 10/2021 (SENP) | POWER PLANT CONTROLLER SIMULATION MODEL | ||
CX5130 | 25/05/2022 | -- | 21266-2-CER | INGETEAM POWER TECHNOLOGY, S.A. | NTS: 10/2021 (SENP) | POWER PLANT CONTROLLER | ||
Gamesa Electric PV Controller | 25/05/2022 | -- | 21268-CER | Gamesa Electric S.A.U | NTS: 10/2021 (SEPE) | POWER PLANT CONTROLLER | ||
Gamesa Electric PV Controller | 25/05/2022 | -- | 21268-CER-VM | Gamesa Electric S.A.U | NTS: 10/2021 (SEPE) | SIMULACIÓN POWER PLANT CONTROLLER | ||
PPC | 31/05/2022 | -- | 20730-3-CER-E1 | Ingelectus S.L. | NTS: 10/2021 (SENP) | POWER PLANT CONTROLLER | ||
PPC | 31/05/2022 | -- | 20730-3-CER-VM-E1 | Ingelectus S.L. | NTS: 10/2021 (SENP) | POWER PLANT CONTROLLER SIMULATION MODEL | ||
PPC | 31/05/2022 | -- | 20730-4-CER-VM-E1 | Ingelectus S.L. | NTS: 10/2021 (SENP) | POWER PLANT CONTROLLER SIMULATION MODEL | ||
PV2500 | 07/07/2022 | -- | 20763-1-CER-E3 | Gamesa Electric S.A.U | NTS: 10/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
PV2500 | 07/07/2022 | -- | 20763-1-CER-VM-E3 | Gamesa Electric S.A.U | NTS: 10/2021 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
R18615TL FI | 06/06/2022 | -- | 20577-1-CER | FIMER S.P.A | NTS:11/2020 (SEPE) | INVERSOR FOTOVOLTAICO | ||
R18615TL FI | 06/06/2022 | -- | 20577-1-CER-VM | FIMER S.P.A | NTS:11/2020 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
Eco 25.0-3-S | 09/06/2022 | -- | 21217-2-CER | Fronius International GmbH | NTS: 10/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
Eco 25.0-3-S | 09/06/2022 | -- | 21217-2-CER-VM | Fronius International GmbH | NTS: 10/2021 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
Eco 25.0-3-S | 09/06/2022 | -- | 21217-3-CER | Fronius International GmbH | NTS: 10/2021 (SENP) | INVERSOR FOTOVOLTAICO | ||
Eco 25.0-3-S | 09/06/2022 | -- | 21217-3-CER-VM | Fronius International GmbH | NTS: 10/2021 (SENP) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
Symo 15.0-3-M | 09/06/2022 | -- | 21217-4-CER | Fronius International GmbH | NTS: 10/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
Symo 15.0-3-M | 09/06/2022 | -- | 21217-4-CER-VM | Fronius International GmbH | NTS: 10/2021 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
Open-PPC-01 | 02/09/2022 | -- | 20631-CER-E4 | Isemaren Energy Solutions | NTS: 10/2021 (SEPE) | POWER PLANT CONTROLLER | ||
Open-PPC-01 | 02/09/2022 | -- | 20631-CER-VM-E4 | Isemaren Energy Solutions | NTS: 10/2021 (SEPE) | SIMULACIÓN POWER PLANT CONTROLLER | ||
ZGR SOLAR STR 250 | 21/06/2022 | 21/06/2022 | 20889-10-CER | Zigor Corporation S.A. | NTS: 10/2021 (SENP) | Three phase solar inverter | ||
ZGR SOLAR STR 250 | 21/06/2022 | 21/06/2022 | 20889-9-CER | Zigor Corporation S.A. | NTS: 10/2021 (SEPE) | Three phase solar inverter | ||
INGECON SUN EMS PLANT CONTROLLER | 07/07/2022 | -- | 20378-2-CER-VM-E2 | Ingeteam Power Technology S.A. Energy | NTS: 04/2021 (SEPE) | SIMULACIÓN POWER PLANT CONTROLLER | ||
INGECON SUN EMS PLANT CONTROLLER | 07/07/2022 | -- | 20378-2-CER-E2 | Ingeteam Power Technology S.A. Energy | NTS: 04/2021 (SEPE) | POWER PLANT CONTROLLER | ||
SUN2000-185KTL-H1 | 07/07/2022 | -- | 20329-4-CER-VM-E1 | Huawei | NTS: 04/2021 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
SUN2000-185KTL-H1 | 07/07/2022 | -- | 20329-4-CER-E2 | Huawei | NTS: 04/2021 (SEPE) | Three phase solar inverter | ||
CcMaster ComBox PPC | 08/07/2022 | -- | 21188-1-CER-VM | ENERCLIC INNOVATIO, S.L | NTS: 10/2021 (SEPE) | SIMULACIÓN POWER PLANT CONTROLLER | ||
CcMaster ComBox PPC | 08/07/2022 | -- | 21188-1-CER | ENERCLIC INNOVATIO, S.L | NTS: 10/2021 (SEPE) | POWER PLANT CONTROLLER | ||
CcMaster ComBox PPC | 08/07/2022 | -- | 21188-2-CER-VM | ENERCLIC INNOVATIO, S.L | NTS: 10/2021 (SENP) | SIMULACIÓN POWER PLANT CONTROLLER | ||
CcMaster ComBox PPC | 08/07/2022 | -- | 21188-2-CER | ENERCLIC INNOVATIO, S.L | NTS: 10/2021 (SENP) | POWER PLANT CONTROLLER | ||
PV3750 STD | 29/07/2022 | -- | 21621-1-CER | Gamesa Electric S.A.U | NTS: 10/2021 (SEPE) | INVERSOR FOTOVOLTAICO | ||
PV3750 STD | 29/07/2022 | -- | 21621-1-CER-VM | Gamesa Electric S.A.U | NTS: 10/2021 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
PV3750 STD | 29/07/2022 | -- | 21621-2-CER | Gamesa Electric S.A.U | NTS: 10/2021 (SENP) | INVERSOR FOTOVOLTAICO | ||
PV3750 STD | 29/07/2022 | -- | 21621-2-CER-VM | Gamesa Electric S.A.U | NTS: 10/2021 (SENP) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
Renovagy PPC | 04/06/2022 | -- | 21547-2-CER-E1 | Sisenol Solutions S.L. | NTS: 04/2021 (SENP) | POWER PLANT CONTROLLER | ||
Renovagy PPC | 04/06/2022 | -- | 21547-2-CER-VM-E1 | Sisenol Solutions S.L. | NTS: 04/2021 (SENP) | SIMULACIÓN POWER PLANT CONTROLLER | ||
Renovagy PPC | 04/06/2022 | -- | 21547-1-CER-E1 | Sisenol Solutions S.L. | NTS: 04/2021 (SEPE) | POWER PLANT CONTROLLER | ||
Renovagy PPC | 04/06/2022 | -- | 21547-1-CER-VM-E1 | Sisenol Solutions S.L. | NTS: 04/2021 (SEPE) | SIMULACIÓN POWER PLANT CONTROLLER | ||
Renovagy PPC | 04/06/2022 | -- | 20817-2-CER-E1 | Renovagy | NTS: 04/2021 (SENP) | POWER PLANT CONTROLLER | ||
Renovagy PPC | 04/06/2022 | -- | 20817-2-CER-VM-1 | Renovagy | NTS: 04/2021 (SENP) | SIMULACIÓN POWER PLANT CONTROLLER | ||
Renovagy PPC | 06/09/2021 | -- | 20817-CER-E2 | BD4BS | NTS: 04/2021 (SENP) | POWER PLANT CONTROLLER | ||
Renovagy PPC | 06/09/2021 | -- | 20817-CER-VM-E2 | BD4BS | NTS: 04/2021 (SENP) | SIMULACIÓN POWER PLANT CONTROLLER | ||
Renovagy PPC | 04/06/2022 | -- | 20259-5-2-CER-E1 | Renovagy | NTS: 04/2021 (SEPE) | POWER PLANT CONTROLLER | ||
Renovagy PPC | 04/06/2022 | -- | 20259-5-2-CER-VM-E1 | Renovagy | NTS: 04/2021 (SEPE) | SIMULACIÓN POWER PLANT CONTROLLER | ||
Renovagy PPC | 04/06/2022 | -- | 20259-5-CER-E2 | BD4BS | NTS: 04/2021 (SEPE) | POWER PLANT CONTROLLER | ||
Renovagy PPC | 04/06/2022 | -- | 20259-5-CER-VM-E2 | BD4BS | NTS: 04/2021 (SEPE) | SIMULACIÓN POWER PLANT CONTROLLER | ||
PVS-175-TL1-WB-SX-IFANNSY | 19/09/2022 | -- | 21018-1-CER | FIMER S.p.A | NTS: 10/2021 (SEPE) | Inversor fotovoltaico | ||
PVS-175-TL1-WB-SX-IFANNSY | 19/09/2022 | -- | 21018-1-CER-VM | FIMER S.p.A | NTS: 10/2021 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
PVS-175-TL1-WB-SX-IFANNSY | 19/09/2022 | -- | 21018-2-CER | FIMER S.p.A | NTS: 10/2021 (SEPE) | Inversor fotovoltaico | ||
PVS-175-TL1-WB-SX-IFANNSY | 19/09/2022 | -- | 21018-2-CER-VM | FIMER S.p.A | NTS: 10/2021 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
TS208KTL-HV | 28/09/2022 | -- | 21744-CER | TBEA Xi'an Electric Technology Co., Ltd | NTS: 10/2021 (SEPE) | Inversor fotovoltaico | ||
TS208KTL-HV | 28/09/2022 | -- | 21744-CER-VM | TBEA Xi'an Electric Technology Co., Ltd | NTS: 10/2021 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
UC-8112-ME-T-LX | 29/09/2022 | -- | 21318-1-CER | Green Power Monitor | NTS: 10/2021 (SEPE) | POWER PLANT CONTROLLER | ||
UC-8112-ME-T-LX | 29/09/2022 | -- | 21318-1-CER-VM | Green Power Monitor | NTS: 10/2021 (SEPE) | SIMULACIÓN POWER PLANT CONTROLLER | ||
UC-8112-ME-T-LX | 29/09/2022 | -- | 21318-2-CER | Green Power Monitor | NTS: 10/2021 (SENP) | Power Plant Controller | ||
UC-8112-ME-T-LX | 29/09/2022 | -- | 21318-2-CER-VM | Green Power Monitor | NTS: 10/2021 (SENP) | SIMULACIÓN POWER PLANT CONTROLLER | ||
SUN2000-185KTL-H1 | 30/09/2021 | -- | 21791-CER | Huawei Technologies Spain | NTS: 10/2021 (SEPE) | Inversor fotovoltaico | ||
TC1250KF | 19/10/2022 | -- | 21746-CER-VM | TBEA Xi'an Electric Technology Co., Ltd | NTS: 10/2021 (SEPE) | SIMULACIÓN INVERSOR FOTOVOLTAICO | ||
TC1250KF | 19/10/2022 | -- | 21746-CER | TBEA Xi'an Electric Technology Co., Ltd | NTS: 10/2021 (SEPE) | Inversor fotovoltaico | ||
APS4000-ES-4-550-5 | 28/10/2022 | 28/10/2027 | 21588-1-CER | WSTECH GmbH | EN 50549-1: 2019; EN 50549-2: 2029 | Inverter for PV, Energy storage, Statcom, Hybrid | ||
SYMPHONY BOX | 11/11/2022 | -- | 21643-1-CER | Ric Sun España S.L. | NTS: 10/2021 (SEPE) | Power Plant Controller | ||
SYMPHONY BOX | 11/11/2022 | -- | 21643-1-CER-VM | Ric Sun España S.L. | NTS: 10/2021 (SEPE) | SIMULACIÓN POWER PLANT CONTROLLER | ||
SYMPHONY BOX | 11/11/2022 | -- | 21643-2-CER | Ric Sun España S.L. | NTS: 10/2021 (SENP) | Power Plant Controller | ||
SYMPHONY BOX | 11/11/2022 | -- | 21643-2-CER-VM | Ric Sun España S.L. | NTS: 10/2021 (SENP) | SIMULACIÓN POWER PLANT CONTROLLER | ||
SYMPHONY BOX | 25/11/2022 | -- | 21725-1-CER | Deltatec Systems S.L. | NTS: 10/2021 (SEPE) | Power Plant Controller | ||
SYMPHONY BOX | 25/11/2022 | -- | 21725-1-CER-VM | Deltatec Systems S.L. | NTS: 10/2021 (SEPE) | SIMULACIÓN POWER PLANT CONTROLLER | ||
SYMPHONY BOX | 25/11/2022 | -- | 21725-2-CER | Deltatec Systems S.L. | NTS: 10/2021 (SENP) | Power Plant Controller | ||
SYMPHONY BOX | 25/11/2022 | -- | 21725-2-CER-VM | Deltatec Systems S.L. | NTS: 10/2021 (SENP) | SIMULACIÓN POWER PLANT CONTROLLER | ||
HEMK FS4390K | 28/11/2022 | -- | 21016-1-CER | POWER ELECTRONICS S.L. | NTS: 10/2021 (SEPE) | Inversor fotovoltaico | ||
HEMK FS4390K | 28/11/2022 | -- | 21016-1-CER-VM | POWER ELECTRONICS S.L. | NTS: 10/2021 (SEPE) | Inversor fotovoltaico | ||
HEMK FS4390K | 28/11/2022 | -- | 21016-2-CER | POWER ELECTRONICS S.L. | NTS: 10/2021 (SENP) | Inversor fotovoltaico | ||
HEMK FS4390K | 28/11/2022 | -- | 21016-2-CER-VM | POWER ELECTRONICS S.L. | NTS: 10/2021 (SENP) | Inversor fotovoltaico | ||
PQstorl-M | 02/12/2022 | 02/12/2027 | 21614-1-CER | Hitachi Energy Belgium N.V | VDE 4105: 2018-11 | Battery Energy Storage Inverter | ||
KACO blueplanet 125 TL3 M1 WM OD IIP0 | 02/12/2022 | 02/12/2027 | 21601-4-CER | KACO new energy GmbH | CEI 0-16: 2021 | Photovoltaic inverter | ||
BluE-S 5000D-M1 | 13/12/2022 | -- | 21694-1-CER | Shenzhen Kstar New Energy Company Limited | NTS: 10/2021 (SENP) | Inversor fotovoltaico | ||
NXA_0502_6 | 15/12/2022 | 15/12/2027 | 21789-3-CER | Vacon Oy | CEI 0-16: 2021 | Photovoltaic inverter | ||
SG1100UD | 30/12/2022 | 21517-1-CER | Sungrow Power Supply Co. Ltd | NTS: 10/2021 (SEPE) | Inversor fotovoltaico | |||
SG1100UD | 30/12/2022 | 21517-1-CER-VM | Sungrow Power Supply Co. Ltd | NTS: 10/2021 (SEPE) | Inversor fotovoltaico | |||
SG1100UD | 30/12/2022 | 21517-2-CER | Sungrow Power Supply Co. Ltd | NTS: 10/2021 (SENP) | Inversor fotovoltaico | |||
SG1100UD | 30/12/2022 | 21517-2-CER-VM | Sungrow Power Supply Co. Ltd | NTS: 10/2021 (SENP) | Inversor fotovoltaico | |||
MHC01 | 20/01/2023 | 21640-1-CER | meteocontrol GmbH | NTS: 10/2021 (SEPE) | Power Plant Controller | |||
MHC01 | 20/01/2023 | 21640-1-CER-VM | meteocontrol GmbH | NTS: 10/2021 (SEPE) | Power Plant Controller Simulation | |||
BCO-2000-8365UE | 20/01/2023 | 21376-CER | Webdom Labs, S.L. | NTS: 10/2021 (SEPE) | Power Plant Controller | |||
BCO-2000-8365UE | 20/01/2023 | 21376-CER-VM | Webdom Labs, S.L. | NTS: 10/2021 (SEPE) | Power Plant Controller Simulation | |||
GSM 1250 | 09/02/2023 | -- | 21700-CER | Crisol Alcores S.L | NTS: 10/2021 (SEPE) | Three phase solar inverter | ||
GSM 1250 | 13/07/2022 | -- | 20191-1-CER-VM-E1 | Crisol Alcores S.L | NTS: 10/2021 (SEPE) | Three phase solar inverter simulation | ||
KACO blueplanet 125 TL3 M1 WM OD IIP0 | 10/02/2023 | 10/02/2028 | 21601-6-CER | KACO new energy GmbH | EN 50549-1: 2019 | Photovoltaic inverter | ||
KACO blueplanet 165 TL3 M1 WM OD IIQ0 | EN 50549-2: 2019 | |||||||
KACO blueplanet 125 TL3 M1 WM OD IIP0 | 10/02/2023 | 10/02/2028 | 21749-1-CER | KACO new energy GmbH | EN 50549-1: 2019 | Grid-tied bidirectional converter | ||
KACO blueplanet 165 TL3 M1 WM OD IIQ0 | EN 50549-2: 2019 | |||||||
PSF CASAS DE DON PEDRO I | 03/12/2021 | -- | 20485-1-CER-E2 | HAZ LOS GIRASOLES S.L.U. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF CASAS DE DON PEDRO II | 03/12/2021 | -- | 20485-2-CER-E2 | SEGRE ENERGIA S.L.U | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF PALABRA (Cluster Aragón III) | 29/11/2021 | -- | 21102-1-CER | PALABRA SOLAR S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Esplendor (Cluster Aragón III) | 29/11/2021 | -- | 21102-2-CER | ESPLENDOR SOLAR S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Hazaña (Cluster Aragón III) | 29/11/2021 | -- | 21102-3-CER | HAZAÑA SOLAR S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Talento (Cluster Aragón III) | 29/11/2021 | -- | 21102-4-CER | TALENTO SOLAR S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Sierrezuela (Cluster Chiprana) | 29/11/2021 | -- | 21102-5-CER | ENERGÍA SIERREZUELA S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Ribagrande (Cluster Chiprana) | 29/11/2021 | -- | 21102-7-CER | RIBAGRANDE ENERGÍA S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Valdelagua (Chiprana) | 29/11/2021 | -- | 21102-8-CER | VALDELAGUA WIND POWER S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Escarnes (Cluster Escatrón I) | 01/12/2021 | -- | 21102-9-CER | ESCARNES SOLAR S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Envitero (Cluster Escatrón I) | 01/12/2021 | -- | 21102-10-CER | ENVITERO SOLAR S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Escatrón Dos (Cluster Escatrón I) | 01/12/2021 | -- | 21102-11-CER | ESCATRÓN SOLAR DOS S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Alcázar I | 01/12/2021 | -- | 21102-16-CER | PLANTA SOLAR ALCAZAR 1 S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Alcázar II | 01/12/2021 | -- | 21102-17-CER | PLANTA SOLAR ALCAZAR 2 S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Valdivieso | 01/12/2021 | -- | 21102-18-CER | ENERGIAS AMBIENTALES DE SORIA S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Valdecarro | 01/12/2021 | -- | 21102-19-CER | PARQUE EÓLICO VALDECARRO S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Robledo (Cluster Chiprana) | 02/12/2021 | -- | 21102-6-CER | EL ROBLEDO EOLICA S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Emoción (Cluster Escatrón I) | 02/12/2021 | -- | 21102-12-CER | Emoción (Escatrón I) | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Mocatero (Cluster Escatrón II) | 02/12/2021 | -- | 21102-13-CER | MOCATERO SOLAR S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Ignis (Cluster Escatrón II) | 02/12/2021 | -- | 21102-14-CER | IGNIS SOLAR UNO S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Mediomonte (Cluster Escatrón II) | 02/12/2021 | -- | 21102-15-CER | MEDIOMONTE SOLAR S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Puertollano 5 | 13/12/2021 | -- | 20452-6-CER | Renovalia Solar 5 S.L.U. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Puertollano 6 | 13/12/2021 | -- | 20452-7-CER | Renovalia Solar 6 S.L.U. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Puertollano 7 | 13/12/2021 | -- | 20452-8-CER | Renovalia Solar 7 S.L.U. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Puertollano 8 | 13/12/2021 | -- | 20452-9-CER | Renovalia Solar 8 S.L.U. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Puertollano 9 | 13/12/2021 | -- | 20452-10-CER | Renovalia Solar 9 S.L.U. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
CF Calamocha II | 21/12/2021 | -- | 20445-1-CER | FUERZAS ENERGETICAS DEL SUR DE EUROPA IV S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
CF ESCUCHA II | 21/12/2021 | -- | 20445-2-CER | FUERZAS ENERGETICAS DEL SUR DE EUROPA XIX S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
CF HIJAR I | 21/12/2021 | -- | 20445-3-CER | IMPLANTACIÓN DE FUENTES ENERGÉTICAS DE ORIGEN RENOVABLE S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
CF PEÑAFLOR II | 21/12/2021 | -- | 20445-4-CER | ARAGONESA DE GESTIÓN DE ENERGIAS ALTERNATIVAS S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
CF TAMBORES I | 21/12/2021 | -- | 20445-5-CER | ENERGIAS RENOVABLES DE IXION S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
FV Bocabarranco | 27/01/2022 | -- | 21167-1-CER | CANUTILLO DE SABINOSA S.L. | NTS:10/2021 (SENP) | Planta fotovoltaica (MPE) | ||
FV Barranco de la Grea | 27/01/2022 | -- | 21167-2-CER | CANUTILLO DE SABINOSA S.L. | NTS:10/2021 (SENP) | Planta fotovoltaica (MPE) | ||
FV Corral de Espino | 27/01/2022 | -- | 21167-3-CER | CANUTILLO DE SABINOSA S.L. | NTS:10/2021 (SENP) | Planta fotovoltaica (MPE) | ||
FV Juncanillo del Sur | 27/01/2022 | -- | 21167-4-CER | CANUTILLO DE SABINOSA S.L. | NTS:10/2021 (SENP) | Planta fotovoltaica (MPE) | ||
FV La Tartaguera | 27/01/2022 | -- | 21167-5-CER | CANUTILLO DE SABINOSA S.L. | NTS:10/2021 (SENP) | Planta fotovoltaica (MPE) | ||
Valdesolar | 08/02/2022 | -- | 21127-CER | Valdesolar Hive S.L. | NTS:10/2021 (SENP) | Planta fotovoltaica (MPE) | ||
La Isla | 24/02/2022 | -- | 21041-CER-E1 | Novasol Investment La Isla S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
P.F.V. Campanario I | 08/07/2022 | -- | 20860-CER-E1 | Fotovoltaica Campanario I S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
FV Calzadilla-B | 11/03/2022 | -- | 20628-CER | Iberia Termosolar 1, S.L | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Puertollano 5 | 13/05/2022 | -- | 21466-1-CER | Renovalia Solar 8 SLU | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Puertollano 6 | 13/05/2022 | -- | 21466-2-CER | Renovalia Solar 8 SLU | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Puertollano 7 | 13/05/2022 | -- | 21466-3-CER | Renovalia Solar 8 SLU | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Puertollano 8 | 13/05/2022 | -- | 21466-4-CER | Renovalia Solar 8 SLU | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Puertollano 9 | 13/05/2022 | -- | 21466-5-CER | Renovalia Solar 8 SLU | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
FV LA ASOMADA | 10/06/2022 | -- | 21503-CER | LUMINORA SOLAR CUATRO, S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
FV Puente Genil I | 17/06/2022 | -- | 21072-1-CER | IM2 ENERGIA SOLAR PROYECTO 25 SL | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
FV Puente Genil II | 17/06/2022 | -- | 21072-2-CER | IM2 ENERGIA SOLAR PROYECTO 25 SL | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
La Jara Fase 1 | 30/06/2022 | -- | 21087-CER | PRODUCTOS LA JARA, S.A. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
FV Calamocha I | 01/07/2022 | -- | 21039-2-CER-E2 | Fuerzas Energéticas del Sur de Europa S.L.U | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
FV Tejeda Solar | 05/07/2022 | -- | 21152-CER | SOLARPACK INGENIERIA SLU, | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
HSF Peñaflor Solar | 07/07/2022 | -- | 21155-CER | PEÑAFLOR SOLAR, SLU | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
SPK Monclova | 07/07/2022 | -- | 21157-CER | SOLARPACK MONCLOVA S.L.U. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
HSF Pedroso Solar | 07/07/2022 | -- | 21156-CER | PEDROSO SOLAR SLU | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Parque Eólico Monforte I | 22/07/2022 | -- | 20952-9-CER | Fuerzas Energéticas del Sur de Europa VII, S.L. | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
Parque Eólico Monforte II | 22/07/2022 | -- | 20952-10-CER | Fuerzas Energéticas del Sur de Europa VIII, S.L | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
Parque Eólico Quintanilla II | 27/07/2022 | -- | 20975-1-CER | EDP Renovables España S.L.U. | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
Parque Eólico El Castillo | 27/07/2022 | -- | 20975-2-CER | Desarrollos Eólicos de Teruel, S.L. | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
Parque Eólico Piedrahita | 27/07/2022 | -- | 20975-3-CER | Desarrollos Eólicos de Teruel, S.L. | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
LAS MAJAS VI A | 28/07/2022 | -- | 21246-CER | Desarrollo Eólico Las Majas VI, S.L | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
Parque Eólico La Sarda de 30 MW de Eólica Sostenible del Gállego SL en Sierra de Luna | 28/07/2022 | -- | 20952-6-CER | Eólica Sostenible del Gállego S.L.. | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
Parque eólico La Rinconada de 30 MW de Sociedad Eólica Corrales de Herrera SLU en Herrera de los Navarros, Aguilón y Azuara (Zaragoza) | 29/07/2022 | -- | 20952-7-CER | Sociedad Eólica Corrales de Herrera S.L.U. | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
Parque Eólico El Saso (II fase) de 10 MW de Desarrollo Eólico Las Majas IX, SL en Aguilón y Herrera de los Navarros (Zaragoza) | 29/07/2022 | -- | 20952-8-CER | Desarrollo Eólico Las Majas IX, S.L. | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
La Cometa II | 08/08/2022 | -- | 21111-10-CER | Generación y Suministro de Energía S.A.U. | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
La Cometa I | 12/08/2022 | -- | 21111-9-CER | Generación y Suministro de Energía S.A.U. | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
Las Majas VII A | 18/08/2022 | -- | 21111-3-CER | Desarrollo Eólico Las Majas VII, S.L. | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
Las Majas VII B | 18/08/2022 | -- | 21111-4-CER | Fuerzas Energéticas del Sur de Europa XI, S.L | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
Valdelugo | 23/08/2022 | -- | 20912-1-CER | PARQUE EÓLICO VALDELUGO, S.L. | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
Becerril IIB | 10/11/2022 | -- | 20912-2-CER-E1 | PARQUE EÓLICO TIERRA DE CAMPOS S.L. | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
Parque Eólico Las Majas VII D | 09/09/2022 | -- | 21111-1-CER | Fuerzas Energéticas del Sur de Europa V, S.L. | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
Parque Eólico Las Majas VII C | 09/09/2022 | -- | 21111-5-CER | Fuerzas Energéticas del Sur de Europa XII, S.L | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
PSF Fotosfera | 23/09/2022 | -- | 21105-1-CER | BEE Fotosfera Solar, S.L. | NTS:10/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Kissoro | 23/09/2022 | -- | 21105-2-CER | BEE Kissoro Energías Renovables S.L. | NTS:10/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF Sunplex | 23/09/2022 | -- | 21105-3-CER | BEE Sunplex Energías Renovables S.L. | NTS:10/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF LOS LLANOS | 28/10/2022 | -- | 21282-4-CER | Solar de la Contraviesa 5, S.L.U | NTS:10/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF LAS SALINAS | 28/10/2022 | -- | 21282-5-CER | Solar de la Contraviesa 6, S.L.U | NTS:10/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PSF LOS PICOS | 28/10/2022 | -- | 21282-6-CER | Solar de Controviesa 7 SLU | NTS:10/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
FV Calzadilla-B | 11/03/2022 | -- | 20628-1-CER | Iberia Termosolar 1, S.L | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
IFV Virgen del Carmen | 07/11/2022 | -- | 20891-CER | VIRGEN DEL CARMEN, S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
FV Olivares 50MW Tallin Investment | 18/11/2022 | -- | 21109-CER | Tallín Investments S.L.U. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Escucha I | 25/11/2022 | -- | 21039-1-CER | MODELOS ENERGÉTICOS SOSTENIBLES S.L | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
SOL DE CASAQUEMADA | 29/11/2022 | -- | 20569-CER | Fotovoltaica Yunclillos, S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Cáceres 2020 | 15/12/2022 | -- | 21630-CER | ALTER ENERSUN CÁCERES UNO S.L.U | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Cáceres 2021 | 15/12/2022 | -- | 21632-CER | ALTER ENERSUN CÁCERES DOS S.L.U | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Cáceres 2022 | 15/12/2022 | -- | 21634-CER | ALTER ENERSUN CÁCERES TRES S.L.U | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Torrubia | 27/12/2022 | -- | 21449-CER | ENERGÍA INAGOTABLE DE EOLO S.L. | NTS:04/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Parque eólico El Sotillo de 14,975 MW de Sociedad Eólica y Ecológica Aragonesa 53 SL en Lumpiaque (Zaragoza) | 18/01/2023 | -- | 20841-1-CER | Sociedad Eólica y Ecológica Aragonesa 53, S.L. | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
Parque eólico El Sotillo de 14,975 MW de Parque eólico Tablares de 11,930 MW de Sociedad Eólica Ribera Baja SL en Lumpiaque (Zaragoza) | 18/01/2023 | -- | 20841-2-CER | Sociedad Eólica Ribera Baja, S.L. | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
PSFV Palma del Río | 27/01/2023 | -- | 20915-CER | PSFV PALMA DEL RÍO, S.L. | NTS:10/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
La Solana | 02/02/2023 | -- | 21200-CER | LUSITANIA RENOVABLES S.L. | NTS:10/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
PE Delmoro | 03/02/2023 | -- | 20975-5-CER | EDP Renovables España, S.L.U | NTS:10/2021 (SEPE) | Parque eólico (MPE) | ||
Calatayud I | 08/02/2023 | -- | 21476-CER | INFRAESTRUCTURAS Y DESARROLLOS DE ENERGÍAS MEDIOAMBIENTALES, S.L | NTS:10/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Los Llanos I | 09/02/2023 | -- | 21070-1-CER | MARTIN DIRECTORSHIP, S.L | NTS:10/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Los Llanos II | 09/02/2023 | -- | 21070-2-CER | ARBATAX INVESTMENTS, S.L. | NTS:10/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Los Llanos III | 09/02/2023 | -- | 21070-3-CER | CAVALIER DIRECTORSHIP, SL | NTS:10/2021 (SEPE) | Planta fotovoltaica (MPE) | ||
Linear actuator 2M | 11/03/2020 | 11/03/2023 | 20344-CER | N/A | ARCELOR MITTAL | IEC 62817:2014+A1:2017 ch.8.5 | Linear actuator | |
ESATRACK M5 - 1V | 10/03/2020 | 10/03/2023 | 20174-CER | N/A | ESASOLAR | IEC 62817:2014+A1:2017 | Solar tracker | |
BalanceD steel bearing | 06/09/2019 | -- | 20264-1-CER | N/A | PIA SOLAR (PTY) | IEC 62817:2014+A1:2017 | Solar tracker | |
BalanceD+ plastic bearing | 09/09/2019 | -- | 20264-2-CER | N/A | PIA SOLAR (PTY) | IEC 62817:2014+A1:2017 | Solar tracker | |
iTracker iT90 | 25/02/2020 | 25/02/2023 | 20412-2-CER | N/A | SOLTIGUA | IEC 60204-1:2005 ch.18.2.2 | Solar tracker | |
FS3300K | 09/03/2020 | 09/03/2023 | 20495-CER | 3000 kVA | POWER ELECTRONICS | UNE-EN 60068-2-68:1997 | Solar Inverter | |
SUN2000-185KTL-H1 | 21/04/2020 | 20/09/2023 | 20525-CER | 185 kW | HUAWEI | RETIE 2013 y borrador 2018 | Photovoltaic Inverter | |
INGECON SUN 1170TL B450 | 19/05/2020 | 19/05/2023 | 20361-CER | 1169 kW | INGETEAM | Allegato A68 2018 | Photovoltaic Inverter | |
12-2009IEC-Asynchronous 3 phases motor tracker controller for mechnical linked row tracker (type 1) | 26/05/2020 | 26/05/2023 | 20622-1-CER | N/A | SISTEMAS DIGITALES DE CONTROL 2002 | IEC 62817:2014+A1:2017 ch. 9 | Control unit | |
16-2035IEC-Asynchronous 3 phases motor tracker controller for up to 3 independent rows (type 2) | 30/05/2020 | 30/05/2023 | 20622-2-CER | N/A | SISTEMAS DIGITALES DE CONTROL 2002 | IEC 62817:2014+A1:2017 ch. 9 | Control unit | |
VD6-60S110-LC-24H24225-E070 | 28/07/2020 | 30/06/2023 | 20338-1-CER-E1 | NA | MECASOLAR | IEC 62817:2014+A1:2017 ch. 9 | Slew drive | |
SMILE B3 | 11/08/2020 | 11/08/2023 | 20673-CER | 3000 W | Alpha ESS | Real Decreto 1699/2011 18 nov. | Energy Storage System | |
APS2000-H-2-550-5 | 14/09/2020 | 14/09/2023 | 20684-CER | 2000 kW | WSTECH | Portaria nº73/2020 | Inverter for PV, Energystorage, Statcom, Hybrid | |
6SP12XX-XEX05-4XXX | 14/09/2020 | 14/09/2023 | 20687-CER | 2000 kW | SIEMENS | Portaria nº73/2020 | Inverter for PV | |
SL-SPT-ZB-PV / self-powered TCU | 18/09/2020 | 18/09/2023 | 20728-1-CER | N/A | P4Q Electronics | IEC 62817:2014 ch.9 | Control unit | |
SL-TCU / single line | 18/09/2020 | 18/09/2023 | 20728-2-CER | N/A | P4Q Electronics | IEC 62817:2014 ch.9 | Control unit | |
INGECON SUN 100TL | 04/11/2020 | 04/11/2023 | 20553-1-CER | 100 kW | INGETEAM | IEEE 519:2014 | Photovoltaic Inverter | |
INGECON SUN 1170TL B450 | 04/12/2020 | 04/12/2023 | 20553-2-CER | 1169 kVA | INGETEAM | Abu Dhabi - TRANSCO 27 April 2016 | Photovoltaic Storage-Inverter | |
INGECON SUN 1170TL B450 | 04/12/2020 | 04/12/2023 | 20553-3-CER | 1169kVA | INGETEAM | EN 50524:2010 | Photovoltaic Storage-Inverter | |
INGECON SUN 100TL | 04/12/2020 | 04/12/2023 | 20553-4-CER | 100 kW | INGETEAM | Abu Dhabi - TRANSCO 27 April 2016 | Photovoltaic Inverter | |
INGECON SUN 1170TL B450 | 16/12/2020 | 16/12/2023 | 20553-5-CER | 1169kVA | INGETEAM | UNE-EN 60068-2-68:1997 (Sand test) | Photovoltaic Storage-Inverter | |
PQstorl-M | 12/01/2021 | 12/01/2024 | 20807-5-CER | 30 kW | ABB Power Grids Belgium N.V | Technical regulation 3.3.1 rev.2 18-12-2019 | Battery Energy Storage Inverter | |
blueplanet 165TL3 M1 WM OD IIQ0 | 30/09/2020 | 30/09/2023 | 20537-19-CER | 165 kW | KACO | IEC 60068-2-1:2007 | Photovoltaic Inverter | |
blueplanet 165TL3 M1 WM OD IIQ0 | 30/09/2020 | 30/09/2023 | 20537-20-CER | 165 kW | KACO | RETIE 2013 y borrador 2018 | Photovoltaic Inverter | |
blueplanet 165TL3 M1 WM OD IIQ0 | 30/09/2020 | 30/09/2023 | 20537-18-CER | 165 kW | KACO | PRIÍLOHA 4: 2016 | Photovoltaic Inverter | |
blueplanet 165TL3 M1 WM OD IIQ0 | 30/09/2020 | 30/09/2023 | 20537-21-CER | 165 kW | KACO | Despacho 9 02/2018 | Photovoltaic Inverter | |
PS500 | 23/03/2021 | 05/02/2024 | 20382-6-CER-E1 | 500 kVA | ABB Power Grids Italy | Allegato A.68 | Bidirectional Energy storage & Microgrid PCS | |
Gamesa Electric PV Controller | 25/02/2021 | 25/02/2024 | 20765-1-CER | N/A | Gamesa Electric | CEI 0-16. 04-2019 | Power Plant Controller | |
Gamesa Electric PV Controller | 25/02/2021 | 25/02/2024 | 20765-2-CER | N/A | Gamesa Electric | Arrêté du 9 juin 2020 | Power Plant Controller | |
Gamesa Electric PV Controller | 08/03/2021 | 08/03/2024 | 20765-3-CER | N/A | Gamesa Electric | Portaria nº73/2020 | Power Plant Controller | |
Gamesa Electric PV Controller | 08/03/2021 | 08/03/2024 | 20765-5-CER | N/A | Gamesa Electric | CEA Part III, section 4. 2010 +Amd. 2019 | Power Plant Controller | |
Gamesa Electric PV Controller | 08/03/2021 | 08/03/2024 | 20765-6-CER | N/A | Gamesa Electric | Eirgrid Grid Code version 8 | Power Plant Controller | |
SUN2000 185 KTL-H1 | 13/04/2021 | 20/09/2023 | 20958-CER | 185 kW | Huawei Technologies Colombia | RETIE 2013 y borrador 2018 | Photovoltaic Inverter | |
PS500 | 23/04/2021 | 23/04/2024 | 20727-5-CER | 500 kVA | ABB Power Grids Italy | TRANSMISSION CODE Singapore 31/10/2019 | Bidirectional Energy storage & Microgrid PCS | |
Tauro ECO 100-3-P | 21/05/2021 | 21/05/2024 | 20788-3-CER | 100 kW | Fronius | UNE 206006:2011 IN | Three-phase solar inverter | |
Tauro ECO 100-3-P | 21/05/2021 | 21/05/2024 | 20788-4-CER | 100 kW | Fronius | RD 1699/2011 | Three-phase solar inverter | |
INGECON SUN 1110TL B400 | 28/05/2021 | 28/05/2024 | 20901-1-CER | 1110 kW | INGETEAM | RETIE 2013 y borrador 2018 | Solar Inverter | |
50-100195 (PD 500) | 25/05/2021 | 25/05/2024 | 20708-11-CER | 500 kVA | EPC Power Corp. | PRIÍLOHA 4: 2016 | Bidirectional Energy storage & Microgrid PCS | |
50-100195 (PD 500) | 25/05/2021 | 25/05/2024 | 20708-13-CER | 500 kVA | EPC Power Corp. | IEC TS 62786:2017 | Bidirectional Energy storage & Microgrid PCS | |
APS1000-ES-1-550-5 | 17/06/2021 | 17/06/2024 | 20978-CER | 1000 kW | WSTECH | Finnish Grid Code 2019 | Inverter for PV, Energystorage, Statcom, Hybrid | |
50-100195 (PD 500) | 30/06/2021 | 24/03/2024 | 20960-6-CER | 500 kVA | EPC Power Corp. | Technical regulation 3.3.1 rev.2 18-12-2019 | Bidirectional Energy storage & Microgrid PCS | |
50-100195 (PD 500) | 30/06/2021 | 24/03/2024 | 20960-5-CER | 500 kVA | EPC Power Corp. | Allegato A.68 | Bidirectional Energy storage & Microgrid PCS | |
TVR200 | 06/07/2021 | 06/07/2024 | 20908-CER | N/A | TGB Group | IEC 62817:2014+A1:2017 ch. 8.5 | Slew drive | |
EFASOLAR Power Plant Controller | 09/07/2021 | 09/07/2024 | 20607-2-CER | N/A | EFASOLAR | Commision Regulation (EU) 2016/631 | Power Plant Controller | |
EFASOLAR Power Plant Controller | 09/07/2021 | 09/07/2024 | 20607-3-CER | N/A | EFASOLAR | Portaria nº73/2020 | Power Plant Controller | |
STR-150 | 23/07/2021 | 23/07/2024 | 20667-3-CER | N/A | P4Q Electronics | IEC 62817:2014+A1:2017 ch. 9 | Control unit | |
SPB-300 | 23/07/2021 | 23/07/2024 | 20667-4-CER | N/A | P4Q Electronics | IEC 62817:2014+A1:2017 ch. 9 | Control unit | |
A-motion | 27/07/2021 | 27/07/2024 | 20231-CER | N/A | Arcelor Mittal Project Exosun | IEC 62817:2014+A1:2017 | Solar tracker | |
ML 3Hx20 | 30/07/2021 | 30/07/2024 | 20896-CER | N/A | Axial Structural Solutions | IEC 62817:2014+A1:2017 | Solar tracker | |
AC2-300 | 23/11/2021 | 23/11/2026 | 20667-6-CER | N/A | P4Q Electronics | IEC 62817:2014+A1:2017 ch. 9 | Control unit | |
STR-300 | 11/08/2021 | 11/08/2026 | 20667-7-CER | N/A | P4Q Electronics | IEC 62817:2014+A1:2017 ch. 9 | Control unit | |
PVS-100-TL | 21/07/2021 | 21/07/2024 | 20948-CER | 105 kW | FIMER S.p.A | Commision Regulation (EU) 2016/631 | Photovoltaic Inverter | |
APS4000-ES-4-550-5 | 14/09/2021 | 14/09/2026 | 21084-CER | 4000 kW | WSTECH | Netherland grid code | Inverter for PV, Energystorage, Statcom, Hybrid | |
AC2-300 | 23/11/2021 | 11/08/2026 | 20667-5-CER-E1 | NA | P4Q Electronics | IEC 62817:2014 + A1:2017 | Control unit | |
APS2000-H-2-550-5 | 12/11/2021 | 12/11/2026 | 20909-6-CER | 2000 kW | WSTECH | Vietnam grid code | Inverter for PV, Energystorage, Statcom, Hybrid | |
INGECON SUN 1110TL B400 | 01/12/2021 | 01/12/2026 | 20901-2-CER | 1108,5 kVA | INGETEAM | Saudi Arabian grid code | Photovoltaic Inverter | |
INGECON SUN 1110TL B400 | 01/12/2021 | 01/12/2026 | 20901-3-CER | 1108,5 kVA | INGETEAM | Oman grid code | Photovoltaic Inverter | |
INGECON SUN 1110TL B400 | 01/12/2021 | 01/12/2026 | 20901-5-CER | 1108,5 kVA | INGETEAM | Australian Energy Market Operator AEMO | Photovoltaic Inverter | |
INGECON SUN 100TL | 01/12/2021 | 01/12/2026 | 20901-4-CER | 100 kW | INGETEAM | IEC 600068-2-1:2007 | Photovoltaic Inverter | |
INGECON SUN 100TL | 01/12/2021 | 01/12/2026 | 20901-6-CER | 100 kW | INGETEAM | Allegato A.68 | Photovoltaic Inverter | |
INGECON SUN 100TL | 01/12/2021 | 01/12/2026 | 20901-7-CER | 100 kW | INGETEAM | IS 16221 Part 1:2014 | Photovoltaic Inverter | |
INGECON SUN 1110TL B400 | 01/12/2021 | 01/12/2026 | 20901-8-CER | 1108,5 kVA | INGETEAM | IS 16221 Part 1:2014 | Photovoltaic Inverter | |
PV 2600 | 02/12/2021 | 02/12/2026 | 20763-4-CER | 2500 kVA | Gamesa Electric | Allegato A.68 | PV inverter | |
APS2000-H-2-550-5 | 17/12/2021 | 17/12/2026 | 21259-CER | 2000 kW | WSTECH | Turkish grid code | Inverter for PV, Energystorage, Statcom, Hybrid | |
50-100181-R2 (CAB1000/AC-3L.1-R2) | 01/02/2022 | 01/02/2027 | 20708-19-CER | 700 kVA | EPC Power Corp. | Priloha 4: 2016 | Bidirectional Energy storage & Microgrid PCS | |
50-100181-R2 (CAB1000/AC-3L.1-R2) | 01/02/2022 | 01/02/2027 | 20708-20-CER | 700 kVA | EPC Power Corp. | IEC TS 62786:2017 | Bidirectional Energy storage & Microgrid PCS | |
50-100181-R2 (CAB1000/AC-3L.1-R2) | 01/02/2022 | 01/02/2027 | 20708-21-CER | 700 kVA | EPC Power Corp. | Allegato A.68 | Bidirectional Energy storage & Microgrid PCS | |
PV 3750 STD | 10/02/2022 | 11/06/2024 | 21353-CER | 3750 kVA | Gamesa | IEC 600068-2-1:2007 | Three-phase solar inverter | |
H5-C 3Ah | 11/02/2022 | 11/02/2027 | 21404-CER | NA | Sistemas 2002 | IEC 62817:2014 + A1:2017 | Self-powered tracker control unit | |
PS1000 / 3L.1 | 04/03/2022 | 04/03/2027 | 21396-1-CER | 700 kVA | Hitachi | Technical regulation 3.3.1 | Bidirectional Energy storage & Microgrid PCS | |
50-100180-R2 (CAB1000/AC-3L1-R2) | 01/02/2022 | 01/02/2027 | 20708-18-CER | 700 kVA | EPC Power Corp. | Technical regulation 3.3.1 | Bidirectional Energy storage & Microgrid PCS | |
PV 3750 STD | 21/04/2022 | 21/04/2027 | 20764-13-CER | 3750 kVA | Gamesa | Eirgrid v10 | Three-phase solar inverter | |
PV 3750 STD | 18/05/2022 | 20/01/2027 | 20764-8-CER-E1 | 3750 kVA | Gamesa | UTE C15-400 | Three-phase solar inverter | |
TCU STB-150 | 29/04/2022 | 29/04/2027 | 21022-1-CER | NA | P4Q Electronics | IEC 62817:2014 + A1:2017 Ch.9 | Tracker control unit | |
blueplanet gs 137 TL3-S B1 WM OD IIPX | 11/05/2022 | 11/05/2027 | 21014-17-CER | 137 kW | KACO new energy GmbH | Netherlands | Grid-tied battery inverter | |
SP160 | 29/06/2022 | 29/06/2027 | 21421-1-CER | N/A | NCLAVE RENEWABLE // Trina Solar Co. | IEC 62817:2014+A1:2017 | Solar tracker | |
SP160 | 29/06/2022 | 29/06/2027 | 21421-2-CER | N/A | NCLAVE RENEWABLE // Trina Solar Global Merger & Acquisition Pte. | IEC 62817:2014+A1:2017 | Solar tracker | |
SP1000 | 29/06/2022 | 29/06/2027 | 21421-3-CER | N/A | NCLAVE RENEWABLE // Trina Solar Co. | IEC 62817:2014+A1:2017 | Solar tracker | |
SP1000 | 29/06/2022 | 29/06/2027 | 21421-4-CER | N/A | NCLAVE RENEWABLE // Trina Solar Global Merger & Acquisition Pte. | IEC 62817:2014+A1:2017 | Solar tracker | |
50-100195 (PD500) | 01/07/2022 | 01/07/2027 | 20963-1-CER | 500 kVA | EPC Power Corp. | Fingrid Grid Code | Bidirectional Energy storage & Microgrid PCS | |
50-100181 (CAB1000/AC-3L2) | 01/07/2022 | 01/07/2027 | 21171-1-CER | 1043 kW | EPC Power Corp. | Fingrid Grid Code | Bidirectional Energy storage & Microgrid PCS | |
APS2600-ES-4-330-1 | 19/07/2022 | 19/07/2027 | 21415-CER | 2000 kW | WSTECH | Allegato A68 2018 | Inverter for PV, Energystorage, Statcom, Hybrid | |
TSC 1.00 w 6,4Ah | 20/07/2022 | 20/07/2027 | 20481-2-CER | NA | Gonvarri Solar Steel S.L. | IEC 62817:2014+A1:2017 ch.9 | Tracker control unit | |
EFASOLAR Power Plant Controller | 01/08/2022 | 01/08/2027 | 20607-4-CER | NA | EFACEC | Netherlands | PPC | |
EFASOLAR 500 | 01/08/2022 | 01/08/2027 | 20606-4-CER | 500 kW | EFACEC | Netherlands | Three-phase solar inverter | |
TracSmart+ 5.01 1V dual row | 26/08/2022 | 26/08/2027 | 21040-2-CER | Gonvarri Solar Steel S.L. | IEC 62817:2014 + A1:2017 | Horizontal single axis tracker | ||
TracSmart+ 5.01 1V single row | 26/08/2022 | 26/08/2027 | 21040-1-CER | Gonvarri Solar Steel S.L. | IEC 62817:2014 + A1:2017 | Horizontal single axis tracker | ||
GAMESA E - 2,25 MVA-SB-I | 07/09/2022 | 22/07/2025 | 21604-3-CER | 2250 kVA | Gamesa Electric | IEC 62891 FDIS: 2017 ED1 | Photovoltaic Inverter | |
blueplanet 125 TL3 M1 WM OD IIP0 | 15/09/2022 | 15/09/2027 | 21403-CER | 125 kVA | KACO | RD 1699/2011 | Solar Inverter | |
PS1000 / 3L.1 | 27/09/2022 | 27/09/2027 | 21396-4-CER | 700 kVA | Hitachi | Fingrid Grid Code | Bidirectional Energy storage & Microgrid PCS | |
CAB1000 3L.2 (50-100181) | 30/09/2022 | 30/09/2024 | 21597-PROT-CER | EPC Power | VDE-AR-N 4110: 2018-11 | Bidirectional Energy Storage & Microgrid PCS | ||
PS500 | 30/09/2022 | 30/09/2024 | 21603-PROT-CER | Hitachi Energy | VDE-AR-N 4110: 2018-11 | Bidirectional Energy Storage & Microgrid PCS | ||
iTracker | 30/09/2022 | 30/09/2027 | 21419-CER | N/A | SOLTIGUA | IEC 62817:2014+A1:2017 | Solar tracker | |
F-CP-2004038-001 | 21/10/2022 | 23/12/2023 | 21829-1-CER | NA | Dabico Airport Solutions | ISO 6858:2018 | Power pack | |
F-CP-2004038-001 | 21/10/2022 | 24/02/2024 | 21829-2-CER | NA | Dabico Airport Solutions | MIL-STD-704E | Power pack | |
F-CP-2004038-001 | 21/10/2022 | 24/02/2024 | 21829-3-CER | NA | Dabico Airport Solutions | DFS 400 | Power pack | |
Msc28+2500+C | 21/10/2022 | 09/11/2023 | 21829-4-CER | N/A | Dabico Airport Solutions | ISO 6858:2017 | Power Pack I-connect | |
25C90S-VG | 21/10/2022 | 08/10/2023 | 21829-5-CER | N/A | Dabico Airport Solutions | ISO 6858:2017 | Static converter | |
APS1300-ES-2-330-1 | 25/10/2022 | 25/10/2027 | 21588-2-CER | NA | WSTECH GmbH | EIFS 2018:2 | Inverter for PV, Energystorage, Statcom, Hybrid | |
PROTEUS PV 4100 | 04/11/2022 | 04/11/2024 | 20764-PROT-CER | 4095 kVA | Gamesa Electric | VDE-AR-N 4110:2018-11 | Prototype three-phase photovoltaic grid-conneted inverter | |
VANGUARD | 17/11/2022 | 21/10/2025 | 21177-CER-E1 | NA | NCLAVE Renewable / Trina Solar Co. Ltd. | IEC 62817:2014 + A1:2017 | Horizontal single axis tracker | |
AGILE | 17/11/2022 | 23/04/2026 | 21265-1-CER-E2 | NA | NCLAVE Renewable / Trina Solar Co. Ltd. | IEC 62817:2014 + A1:2017 | Horizontal single axis tracker | |
TCS2110-00 | 14/12/2022 | 29/10/2023 | 20547-1-CER-E1 | N/A | Electronique Concept | IEC 62817:2014 + A1:2017 Ch. 9 | Control unit | |
TVR300-Z10; motor XD053 | 20/12/2022 | 18/11/2025 | 70092-CER | N/A | TGB Group | IEC 62817:2014 ch.8.5 | Slew drive | |
Ingecon Sun B 1170TL | 20/12/2022 | 14/02/2027 | 21286-CER-E2 | 1169 kW | Ingeteam Power Technology S.A. - Energy | Romania: Anexa Ord208:2018 | Photovoltaic Inverter | |
APS4000-ES-4-550-5 | 21/12/2022 | 31/01/2025 | 21920-CER | 4000 kW | WSTECH GmbH | Eirgrid Grid Code version 11 | Inverter for PV, Energystorage, Statcom, Hybrid | |
PV 3750 STD | 22/12/2022 | 25/11/2026 | 21702-CER | 3750 kVA | Gamesa Electric | Allegato A68, Rev. 3 | Three-phase solar inverter | |
blueplanet gs 92.0 TL3-S B1 WM OD IIGM | 10/02/2023 | 10/02/2028 | 21749-4-CER | 92 kW | KACO | VDE 4105 / Switzerland deviations | Grid-tied battery inverter | |